db04 issue for ssd data
Updated on Mon, 2008-11-03 10:38. Originally created by bouchet on 2008-11-03 10:38.see db04-issue.pdf for introduction
(previous blog entry was deleted)
06 MIP algo ver 1.1
Updated on Tue, 2009-03-10 14:38. Originally created by mattheww on 2008-11-03 09:47. Under:TPC based MIP algo was devised to calibrate BPRS tiles.
Details of the algo are in 1st PDF,
05 ---- peds(softID,capID) & status table, ver=2.2, R9067013
Updated on Tue, 2009-03-10 14:38. Originally created by mattheww on 2008-11-01 14:10. Under:INPUT: st_hysics events from run=9067013
04 BPRS sees beam background?
Updated on Tue, 2009-03-10 14:37. Originally created by mattheww on 2008-11-01 12:38. Under:The pair of plots below demonstrates BPRS pedestal residua are very clean once peds for 128 caps are used and this 5% capID corruption is detected and fixed event by event.
Upsilon in pp2006 P08ic - First look
Updated on Sun, 2008-11-02 15:43. Originally created by rjreed on 2008-10-31 17:45.Figure 1: Analysis of 1st attempt at calculating the upsilon cross section
Draft DB schema for StEmcDecoder
Updated on Thu, 2008-11-06 14:36. Originally created by kocolosk on 2008-10-31 11:32.Update 2008-11-06: minor naming revisions:
- use crate/crateChannel instead of crate/sequence in bemcMapping
- use rdo/rdoChannel instead of crate/position in smd and prs mapping
Update 2008-11-03: I posted a new version of the schemas. The changes are:
- drop
softID
field in favor ofelementID
, as the latter has a special meaning in STAR’s DB API. - add
eta
andphi
float fields to give the physical position of each element. - rename
module-eta-sub
tom-e-s
so we can redefineeta
as above. - added
PMTbox
,MAPMT
, andpixel
fields in the PRS table. - renamed
fiber
tocrate
in the SMD and PRS tables.
Run 9, preparation meeting #3
Updated on Fri, 2008-10-31 10:55 by testadmin. Originally created by jeromel on 2008-10-31 10:55. 2008-10-31 11:00
2008-10-31 12:00
Etc/GMT-5
Friday, 31 October 2008
1-189, HighSpeed conference bridge, at 15:00 (GMT), duration : 01:00
1-189, HighSpeed conference bridge, at 15:00 (GMT), duration : 01:00
Archive of embedding output from Birmingham (Part 1 62 GeV Cu+Cu)
Updated on Fri, 2008-10-31 11:20. Originally created by lbarnby on 2008-10-31 07:51.NB Mainly notes for self but posting here will enable others to see too.
Cu+Cu 62 GeV strangeness request (P05id)
Production Status Update for run 2007/2008
Updated on Thu, 2009-03-19 11:47. Originally created by didenko on 2008-10-31 02:24. Under:Run 2008 auau 9GeV data production
Trigger sets: lowEnergy2008 & bbcvpd; number of events; date of completion; production series
Spin Physcs PWG
Updated on Thu, 2008-10-30 08:43. Originally created by sowinski on 2008-10-30 08:43. 2008-10-30 12:00
2008-10-30 13:30
Etc/GMT-4
Thursday, 30 October 2008
Phone-bridge: 317 263 8800 1 077795# 1, at 16:00 (GMT), duration : 01:30
Phone-bridge: 317 263 8800 1 077795# 1, at 16:00 (GMT), duration : 01:30
Agenda at meetings list
C++ DB-API
Updated on Thu, 2009-08-06 11:39 by testadmin. Originally created by jeromel on 2008-10-30 07:42. Under:Work in progress. Page is located here .