Preliminary for APS2021 (proton-Xi correlation function)
Updated on Thu, 2021-05-13 20:59. Originally created by kmi on 2021-04-10 04:13.
Integration and Cooling System
Updated on Fri, 2021-04-09 14:45. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : Rahul Sharma, Felix Archampong ( BNL )
Talk time : 08:40, Duration : 00:10
Pre-installation Testing
Updated on Sun, 2021-04-18 17:50. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : Xu Sun, Yu Hu ( UIC, Fudan )
Talk time : 09:10, Duration : 00:10
Follow-up on action items
Updated on Sun, 2021-04-18 18:00. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : all
Talk time : 08:30, Duration : 00:10
************* From April 12 *************
Production Status:
Inner and Outer Signal Cables
Updated on Fri, 2021-04-09 14:45. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : Michael Capotosto ( BNL )
Talk time : 08:50, Duration : 00:10
Production module assembly
Updated on Sun, 2021-04-18 20:21 by shenghui. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : Shenghui Zhang ( UIC )
Talk time : 09:00, Duration : 00:10
STAR Forward Silicon Tracker Meeting
Updated on Fri, 2021-04-09 14:45. Originally created by yezhenyu on 2021-04-09 14:45. 2021-04-19 08:30
America/New York
Monday, 19 April 2021
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 12:30 (GMT), duration : 00:00
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 12:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
08:30 | Follow-up on action items ( 00:10 ) 0 files | all |
08:40 | Integration and Cooling System ( 00:10 ) 0 files | Rahul Sharma, Felix Archampong (BNL) |
08:50 | Inner and Outer Signal Cables ( 00:10 ) 0 files | Michael Capotosto (BNL) |
09:00 | Production module assembly ( 00:10 ) 1 file | Shenghui Zhang (UIC) |
09:10 | Pre-installation Testing ( 00:10 ) 0 files | Xu Sun, Yu Hu (UIC, Fudan) |
Follow-up on action items
Updated on Fri, 2021-04-09 14:53. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : all
Talk time : 08:30, Duration : 00:10
1) Completed:
Pre-installation Testing and Installation Plan
Updated on Mon, 2021-04-12 10:06 by videbaks. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : Flemming Videbaek ( BNL )
Talk time : 08:35, Duration : 00:10
The installation plan
has comments for tasks, Mike's overall comments, scetch of testing plan
Integration and Cooling System
Updated on Fri, 2021-04-09 14:45. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : Rahul Sharma, Felix Archampong ( BNL )
Talk time : 08:40, Duration : 00:10
Inner and Outer Signal Cables
Updated on Fri, 2021-04-09 14:45. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : Michael Capotosto ( BNL )
Talk time : 08:50, Duration : 00:10
Mechanical Structure
Updated on Fri, 2021-04-09 14:45. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : Yi Yang ( NCKU )
Talk time : 09:00, Duration : 00:20
Production module assembly
Updated on Sun, 2021-04-11 22:06 by shenghui. Originally created by yezhenyu on 2021-04-09 14:45.Speaker : Shenghui Zhang ( UIC )
Talk time : 09:20, Duration : 00:10
STAR Forward Silicon Tracker Meeting
Updated on Fri, 2021-04-09 14:45. Originally created by yezhenyu on 2021-04-09 14:45. 2021-04-12 08:30
America/New York
Monday, 12 April 2021
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 12:30 (GMT), duration : 00:00
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 12:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
08:30 | Follow-up on action items ( 00:10 ) 0 files | all |
08:35 | Pre-installation Testing and Installation Plan ( 00:10 ) 2 files | Flemming Videbaek (BNL) |
08:40 | Integration and Cooling System ( 00:10 ) 0 files | Rahul Sharma, Felix Archampong (BNL) |
08:50 | Inner and Outer Signal Cables ( 00:10 ) 0 files | Michael Capotosto (BNL) |
09:00 | Mechanical Structure ( 00:20 ) 0 files | Yi Yang (NCKU) |
09:20 | Production module assembly ( 00:10 ) 1 file | Shenghui Zhang (UIC) |
Run21 EPD 'Live' Calibration day 94-100
Updated on Tue, 2021-04-27 13:54. Originally created by dchen on 2021-04-09 13:21.The start run of this calibration is 22094001. The calibration results can be found in 'Nmip_Day_94.txt'.
RUN: 22094001
Run19 14.5GeV Test Production QA
Updated on Fri, 2021-04-09 11:48. Originally created by kehw on 2021-04-09 11:48.feeddown lfsupc status
Updated on Fri, 2021-04-09 11:45. Originally created by jdb on 2021-04-09 11:45.Reference
Talk time : 08:30, Duration : 00:20
LFSUPC PWG QA
Updated on Fri, 2021-04-09 11:06. Originally created by cj17 on 2021-04-09 11:06.Reference
Speaker : Chenliang Jin
Talk time : 13:00, Duration : 00:10
LFSUPC PWG QA
Updated on Fri, 2021-04-09 11:06. Originally created by cj17 on 2021-04-09 11:06.Reference
Speaker : Chenliang Jin
Talk time : 13:00, Duration : 00:10
HFQA_7p7GeV_0409
Updated on Fri, 2021-04-09 10:53. Originally created by yjzhou19 on 2021-04-09 10:52.Reference
Speaker : Yingjie Zhou
Talk time : 13:35, Duration : 00:20