STAR forward sTGC meeting
Updated on Mon, 2021-04-05 12:32. Originally created by sprastar on 2021-04-05 12:32.Online, at 12:30 (GMT), duration : 00:00
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
Join ZoomGov Meeting
https://bnl.zoomgov.com/j/1613389538?pwd=MmtWdTNacmplbHVybU1IbXRIQnFlUT09
Meeting ID: 161 338 9538
Passcode: 487747
One tap mobile
+16692545252,,1613389538#,,,,,,0#,,487747# US (San Jose)
+16468287666,,1613389538#,,,,,,0#,,487747# US (New York)
Dial by your location
+1 669 254 5252 US (San Jose)
+1 646 828 7666 US (New York)
+1 551 285 1373 US
+1 669 216 1590 US (San Jose)
Meeting ID: 161 338 9538
Passcode: 487747
Find your local number: https://bnl.zoomgov.com/u/aewalElB6j
Join by SIP
1613389538@sip.zoomgov.com
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 161 338 9538
Passcode: 487747
Time | Talk | Presenter |
---|---|---|
08:30 | sTGC 60*60 prototype test and VMM test ( 00:20 ) 1 file | Zhen Wang |
08:50 | stgc offline software map ( 00:20 ) 1 file | Daniel Brandenburg |
Tracking Efficiency Uncertainty meeting
https://bnl.zoomgov.com/j/1607035037?pwd=WDVqaEdwa0RtTEM5a1VvZ24yU2gwdz09, at 14:00 (GMT), duration : 01:00
Tracking Efficiency Uncertainty meeting
https://bnl.zoomgov.com/j/1607035037?pwd=WDVqaEdwa0RtTEM5a1VvZ24yU2gwdz09, at 14:00 (GMT), duration : 01:00
Calibration and Production Status
Updated on Wed, 2021-04-07 11:11 by genevb. Originally created by dongx on 2021-04-05 10:58.Reference
Speaker : Gene Van Buren ( BNL )
Talk time : 12:25, Duration : 00:20
- HPSS:
- We saw activity stop at the beginning of each week for a few weeks in a row
- Traced to an internally carried vulnerability
- We saw activity stop at the beginning of each week for a few weeks in a row
SDCC Announcements
Updated on Wed, 2021-04-07 10:51 by jml. Originally created by dongx on 2021-04-05 10:52.Weekly Meeting (Apr 5th, 2021)
- Xiaoxuan: dAu calibration update
- Minghui: calibration update
THERMUS fits of pi/K/p spectra at 27 GeV
Updated on Mon, 2021-04-05 09:00. Originally created by harasty on 2021-04-05 09:00.Centrality Determination in the Fixed-Target Program at STAR
Updated on Mon, 2021-04-05 10:05. Originally created by sweger on 2021-04-05 09:00.Reference
Speaker : Zachary Sweger ( UC Davis )
Talk time : 12:00, Duration : 00:15
Update on the triton production at BES-I
Updated on Mon, 2021-04-05 09:39. Originally created by dingwei on 2021-04-05 06:39.Reference
Speaker : Dingwei Zhang ( ccnu )
Talk time : 11:20, Duration : 00:20
run12 pp200 Inclusive jet cross section preliminary result
Updated on Tue, 2021-06-15 10:04. Originally created by veprbl on 2021-04-05 03:26.Errata:
- The stat. uncertainty error bars were overestimated due to a bug.
BES-II Vertex Selection
Updated on Sun, 2021-04-04 21:57. Originally created by bkimel on 2021-04-04 21:57.Discussion on bad-run rejection in LFSUPC QA work
Updated on Mon, 2021-04-05 09:06. Originally created by cj17 on 2021-04-04 21:26.STAR management meeting
Updated on Mon, 2021-11-15 12:32. Originally created by ruanlj on 2021-04-04 09:23., at 17:00 (GMT), duration : 00:00
Agenda:
1. Run-22 RHIC start up delay, STAR operation
2. S&C
3. QM2022 abstracts
4. STAR analysis meeting
5. AOB
STAR management meeting
Updated on Tue, 2021-10-05 13:29. Originally created by ruanlj on 2021-04-04 09:23., at 16:00 (GMT), duration : 00:00
Agenda:
1.summer shut down:
forward upgrade status, trigger upgrade status,
2. S&C:
3. light nuclei ratio analysis: independent check
4. DNP talks, ...
5. AOB
STAR management meeting
Updated on Thu, 2021-10-14 09:42. Originally created by ruanlj on 2021-04-04 09:23., at 16:00 (GMT), duration : 00:00
Agenda:
1. light nuclei ratio cross check in BES-I data
2.summer shut down:
forward upgrade status, trigger upgrade status,
2. S&C:
3. express stream data analysis, FCV co-convener
4. DNP talks, Spin2021 ...
5. AOB
STAR management meeting
Updated on Fri, 2021-10-22 20:37. Originally created by ruanlj on 2021-04-04 09:23., at 16:00 (GMT), duration : 00:00
Agenda:
1.summer shut down:
forward upgrade status
2. S&C:
3. express stream data analysis
4. BES-II key measurement check
5. BES review paper
6. GPC mailing list
7. QM2022
8. AOB
STAR management meeting
Updated on Mon, 2021-11-01 07:33. Originally created by ruanlj on 2021-04-04 09:23., at 16:00 (GMT), duration : 00:00
Agenda:
1.summer shut down:
forward upgrade status, trigger upgrade status, Run-22
2. S&C:
3. BES-II key measurement check: follow up
4. chirality conference, QM2022
5. AOB
STAR management meeting
Updated on Thu, 2021-11-04 18:41. Originally created by ruanlj on 2021-04-04 09:23., at 17:00 (GMT), duration : 00:00
Agenda:
1. GPC# 303
2. summer shut down, Run-22
3. S&C: rcf slow
4.QM2022 abstracts
5. PYTHIA task force
6. AOB
STAR management meeting
Updated on Sun, 2021-08-08 11:16. Originally created by ruanlj on 2021-04-04 09:23., at 16:00 (GMT), duration : 00:00
Agenda:
1.summer shut down:
forward upgrade status, period coordinators
2. S&C: 19.6 GeV data production
3. CME blind analysis: internal STAR presentation, paper release presentation
4. STAR collaboration meeting
5. AOB
STAR management meeting
Updated on Mon, 2021-08-16 08:14. Originally created by ruanlj on 2021-04-04 09:23., at 16:00 (GMT), duration : 00:00
Agenda:
1.summer shut down:
forward upgrade status, period coordinators
2. S&C: 19.6 GeV data production
3. CME blind analysis: paper release presentation
4. AOB