Embedding issue - progress report

Calibration status and updates

Speaker : Gene Van Buren ( BNL )


Talk time : 12:00, Duration : 00:20

Calibrations status:

  • Run 19 FXT & beam-beam
    • TPC SpaceCharge & GridLeak essentially completed - just the AuAu200 values to put into the database [

Software and Computing Meeting

2020-01-15 12:00
2020-01-15 13:00
America/New York
Wednesday, 15 January 2020
1-189, BlueJean, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Calibration status and updates ( 00:20 ) 0 filesGene Van Buren (BNL)
12:20Embedding issue - progress report ( 00:20 ) 1 fileJason Webb (BNL)
12:40AOB ( 00:20 ) 0 filesAll (All)

TPC Meeting

2020-01-15 15:00
2020-01-15 16:00
America/New York
Wednesday, 15 January 2020
1-189, at 20:00 (GMT), duration : 01:00
Meeting Location - BNL Room 1-189


The Bluejean connection

Title:  STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR

Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))

Meeting ID: 628 045 566
Direct link: https://bnl.bluejeans.com/628045566


Gene: update on the Run 17 pp510 fill-by-fill SpaceCharge & GridLeak calibration


Presentation to BulkCorr Jan 15th - v1 analysis

 

vertex issue

 

MTD local meeting

 QA results and TOF &  TPC calibration problems

open discussion, action items


Talk time : 15:20, Duration : 00:40

 

Code QA report

Speaker : Maria Stefaniak


Talk time : 15:00, Duration : 00:20

 

small system flow note

 This a compact note for BNL management request to discuss the discrepancy with PHENIX results

EMC2 Meeting

2020-01-14 14:00
2020-01-14 15:00
America/New York
Tuesday, 14 January 2020
, at 19:00 (GMT), duration : 01:00

An update to the recent Run 17 pp510 TPC SpaceCharge calibration

In December 2019, we re-produced 5 fills of data from Run 17 pp510 using a new TPC SpaceCharge calibration.

Determination of vertex position with the BBC (recap)

 
Toy Monte Carlo simulation:
- vertex width sigma = 30 cm
- TAC offset 4000
- TAC resolution 100

Test of reconstruction:
- vertex shifted

unfolding-vf

Run15 Collins Asymmetry DIS 2020 Abstract

 

Status on helium3 and anti-helium3 Production in STAR at 54.4GeV

 

Status on (anti-)(_^

 

JetCorr 13-Jan-2020: Scoping work acoplanarity p+Au 200 GeV

 

Jetcorr meeting- 13 Jan 2020 (h+jet 54 GeV)

Jetcorr meeting- 13 Jan 2020 (h+jet 54 GeV)