STAR Protected

tpc weekly

2020-12-16 15:00
America/New York
Wednesday, 16 December 2020
virtual , at 20:00 (GMT), duration : 00:00
 agenda
-- hardware
-- software


Minutes

TPC weekly meeting

 

Hardware;  Alexei excused. Is working on laser and gas system

 

The GG driver modules have been installed (Christian, as Tim is out) One module does not provide HV. There are two spare modules.

David is communicating with Tonko how best to provide the SC for the Gating Grid.

 

Software

Irakli had at LBNL meeting; provided an update to me after meeting

 

“I talked to Yuri last week about progress and the calculation of the distortions.

 

I also pointed out to him a little problem in the reading of the inner sector position parameters from the database. We reached out to Dimitry and he changed the readout for that table. It hopefully was not affecting anything, but now I have a good way to compare apples to apples as far as the inner sector position parameters are concerned.

 

While doing so I noticed that that is where a huge shift in z direction originates, so now I want to see if that is the right result or an artifact from what I've been saying – one can end up in a local minima for the alignment procedure. I will keep you guys updated I the days to come. I am running these jobs as fast as possible (Dmitry's fix has been applied only Monday).”

 

Yuri presented some intermedial results on his investigations of showing effect of his modified equations as discussed in the previous meeting 12/9/2020 that also have the documents

https://www.star.bnl.gov/~fisyak/star/Tpc/Distortions/

 

Unless there are updates we need to discuss in person this was the last TPC meeting for 2020. Please send updates to the mailing list until then 1/5/2021


zoom info
Flemming Videbaek is inviting you to a scheduled ZoomGov meeting.
 
Topic: TPC weekly
Time: Dec 16, 2020 03:00 PM Eastern Time (US and Canada)
 
Join ZoomGov Meeting
https://bnl.zoomgov.com/j/16131885652?pwd=TjQ1eTMwN085NXNtdnhOZEZhRk1SQT09
 
Meeting ID: 161 3188 5652
Passcode: 743219
One tap mobile
+16692545252,,16131885652#,,,,,,0#,,743219# US (San Jose)
+16468287666,,16131885652#,,,,,,0#,,743219# US (New York)
 
Dial by your location
        +1 669 254 5252 US (San Jose)
        +1 646 828 7666 US (New York)
Meeting ID: 161 3188 5652
Passcode: 743219
Find your local number: https://bnl.zoomgov.com/u/abeN7YSxFu
 
Join by SIP
16131885652@sip.zoomgov.com
 
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 161 3188 5652
Passcode: 743219
 
 

December 15

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      388055 files have been converted out of 654286
      Around 60% Completion

BTof issue in Run12 Cu+Au production

This page documents issues in the BTof matching seen in several data sets

TPC weekly

2020-12-09 15:00
America/New York
Wednesday, 9 December 2020
zoom meeting, at 20:00 (GMT), duration : 00:00
 
Agenda:
-hardware status
- software
--- alignment progress 
--- https://drupal.star.bnl.gov/STAR/system/files/he34embedding4th.pdf
--- AOB

minutes

TPC meeting minutes  December 9, 2020

 

Hardware:

Alexei is done with laser maintenance on West side; waiting for etof re-install to be complete on East (done)).

Bob and Tonko finishing the work on Westside, which will close first. One more slicing to be done Wed. Still 5 splicing to be done on East side 

 

Irakli have reported to Yuri he is revisiting the alignment (inner-outer) from the cosmics.

 

Yue-Hang gave update on 3He eff . Guannan had looked at effect on RMS ped in Sl10k in embedding and see no effect. In never libraries the RMSX cut look ok excepts for eta~0 . 

At eta ~0 there may be other issues- as seen for other particles. Yuri points out there may be influence of prompt there |z| > 135, though issues are seen at up to ~20cm (??) from readout chambers.

 

Yuri reported on work on space charge correction and reports there could be a difference between East and West corrections. It is work in progress. Initial report is posted on meeting page, as well as some note by Jim Thomas from ALICE work on this subject.

 

  


 
 
Topic: TPC weekly
Time: Dec 9, 2020 03:00 PM Eastern Time (US and Canada)
 
Join ZoomGov Meeting
https://bnl.zoomgov.com/j/16131885652?pwd=TjQ1eTMwN085NXNtdnhOZEZhRk1SQT09
 
Meeting ID: 161 3188 5652
Passcode: 743219
One tap mobile
+16692545252,,16131885652#,,,,,,0#,,743219# US (San Jose)
+16468287666,,16131885652#,,,,,,0#,,743219# US (New York)
 
Dial by your location
        +1 669 254 5252 US (San Jose)
        +1 646 828 7666 US (New York)
Meeting ID: 161 3188 5652
Passcode: 743219
Find your local number: https://bnl.zoomgov.com/u/abeN7YSxFu
 
Join by SIP
16131885652@sip.zoomgov.com
 
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 161 3188 5652
Passcode: 743219
 
 
TimeTalkPresenter
15:20TPC Distortions (progress report) ( 00:20 ) 2 filesYuri Fisyak

December 8

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      386585 files have been converted out of 654286
      Around 59% Completion

December 1

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      384172 files have been converted out of 654286
      Around 59% Completion

December

 

Cold QCD/ Spin PWG Meeting

2020-12-02 19:00
America/New York
Thursday, 3 December 2020
https://drupal.star.bnl.gov/STAR/pwg/spin/weekly-pwg-meetings, at 00:00 (GMT), duration : 00:00

Cold QCD/ Spin PWG Meeting

2020-12-09 19:00
America/New York
Thursday, 10 December 2020
https://drupal.star.bnl.gov/STAR/pwg/spin/weekly-pwg-meetings, at 00:00 (GMT), duration : 00:00

Cold QCD/ Spin PWG Meeting

2020-12-16 19:00
America/New York
Thursday, 17 December 2020
https://drupal.star.bnl.gov/STAR/pwg/spin/weekly-pwg-meetings, at 00:00 (GMT), duration : 00:00

Cold QCD/ Spin PWG Meeting

2020-11-25 19:00
America/New York
Thursday, 26 November 2020
https://drupal.star.bnl.gov/STAR/pwg/spin/weekly-pwg-meetings, at 00:00 (GMT), duration : 00:00

TPC weekly

2020-12-02 15:00
America/New York
Wednesday, 2 December 2020
virtual , at 20:00 (GMT), duration : 00:00
 

Minutes:
Tim reported on Gating Grid status
Crate has all modified modules. It was tested locally.
The web based script by Tonko does not seem to work after the upgrades. He is aware of it.
The polarity is swtiched at the connector for all. 
The sector 8 is special and should be checked.

FV will contact David on the slow control of the gating grid; how should it be implemented?

Alexei has been working on laser system
- optics replaced; signal looks good
- started with alignment of akll rafters
- propbably will need another week

Software
- no discussion as some key people could not join the meeting today. There was a longer discussion on the run-19 alignment at the monthly S&C meeting
- It is of high priority to get this resolved; will have as agenda point next week




Flemming Videbaek is inviting you to a scheduled ZoomGov meeting.
 
Topic: TPC weekly
Time: Dec 2, 2020 03:00 PM Eastern Time (US and Canada)
 
Join ZoomGov Meeting
https://bnl.zoomgov.com/j/1606998274?pwd=dGtCaHZ4R2NjTEV2ai96S0JYKzdCdz09
 
Meeting ID: 160 699 8274
Passcode: 096271
One tap mobile
+16692545252,,1606998274#,,,,,,0#,,096271# US (San Jose)
+16468287666,,1606998274#,,,,,,0#,,096271# US (New York)
 
Dial by your location
        +1 669 254 5252 US (San Jose)
        +1 646 828 7666 US (New York)
Meeting ID: 160 699 8274
Passcode: 096271
Find your local number: https://bnl.zoomgov.com/u/acWTjIAJ3e
 
Join by SIP
1606998274@sip.zoomgov.com
 
Join by H.323
161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 160 699 8274
Passcode: 096271
 
 

November 24

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      384172 files have been converted out of 654286
      Around 59% Completion

November 17

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      383251 files have been converted out of 654286
      Around 59% Completion

MTD Upsilon paper

 

 

Measurement of sequential Upsilon suppression in Au+Au collisions at √sNN = 200 GeV with STAR experiment

November 10

  • RAW to MuDst production
    • pp500_production_2017 (physics)
      381235 files have been converted out of 654286
      Around 58% Completion

HF PWG

HF PWG

Study of production of Xc reconstructable in p+p at 200 GeV at STAR - Aarif Chaudhary

 Presentation by Aarif Chaudhary for the HF PWG 2020/11/5 meeting. Presentation in both pdf and pptx format are attached.

Study of production of Xc reconstructable in p+p at 200 GeV at STAR - Aarif Chaudhary

 Presentation by Aarif Chaudhary for the HF PWG 2020/11/5 meeting. Presentation in both pdf and pptx format are attached.