Tracking Upgrade Review Material

Under:


The TUP Review is scheduled for Dec. 7th, 2006, and will consist of material from the HFT, IST and HPD groups. The draft charge for the review will be similar to the HFT review charge, archived here: Tracking Review Committee Charge.

The datasets for the upgrade reviews are archived here.

UPGR05
Hit Occupancy
Pion Efficiency (pt, &eta)
Ghosting (pt, &eta, centrality, pileup)
Pion Acceptance
Hits X,Y
Hit Occupancy
Inter-hit distance (r,centrality)
Cluster Finding Eff. (centrality)
Residuals (r,eta,pt,z,centrality)
DCA (pt,centrality,signal)
UPGR06
Hit Occupancy
Pion Efficiency (pt, &eta)
Ghosting (pt, &eta, centrality, pileup)
Pion Acceptance
Hits X,Y
Hit Efficiency
Inter-hit distance (r,centrality)
Cluster Finding Eff. (centrality)
Residuals (r,eta,pt,z,centrality)
DCA (pt,centrality,signal)


Study

Geometry

IST(1),HPD,HFT IST(1),HFT UPGR06 UPGR09 UPGR10 UPGR11
Hit Occupancy
Pion Efficiency (pt, eta)
Pion Acceptance (pt, eta)
Ghosting (pt, eta, centrality, HFT pileup)
Hits X,Y * * * *
Hit Efficiencies X,Y * * * *
Inter-hit distance (r,centrality)
Cluster Finding Eff. (centrality)
Residuals (r,eta,pt,z,centrality)
DCA (pt,centrality,signal)
Secondary vertex Resolution
(D trajectory verctor, phi, centrality)