Home

The STAR experiment

  • Blogs
  • Events
  • Help&FAQ
  • Home
  • Polls
  • Sitemap
  • PWG
  • Software & Computing
  • Sub-systems
  • Council
  • General
  • Juniors

Detector Sub-systems

  • BEMC
  • EEMC
  • ETOF
  • FCS
  • FGT
  • FPD & FMS & FPS
  • FTPC
  • FTT
  • HLT
  • L3
  • PMD
  • PP2PP
  • RICH
  • Roman Pot Phase II*
    • Technical information
    • Data analysis
    • Software
    • Pictures
    • 2009 setup (Phase I)
  • SSD
  • SVT
  • Slow Controls
  • TPC
  • TRG
  • Trigger Detectors
  • VPD
  • test

User login

Navigation

  • Groups
  • Recent posts
Home » Detector Sub-systems

Roman Pot Phase II*

Updated on Sun, 2016-02-14 09:32. Originally created by rafal_s on 2014-08-22 10:23. Under:
  • SubSystems


  Technical information

Run 15 preparations:
Logbook     Packages info     RP labeling
Packages test     Trigger counters test
Operation instructions     Crates photos
Map of connections

Data-taking status
  Data analysis

Elastic proton-proton scattering
Central Exclusive Production
Single Diffractive Dissociation
pAu/pAl Ultra Peripheral Collisions
  Software

Geant4 simulation
Reconstruction
 Pictures

DX-D0 chamber
Roman Pot
Setup in the tunnel
Other useful figures
Meetings history
 2009 setup (Phase I)

Technical notes
Paper reviews: A_NN and A_SS
2009 drupal website (PP2PP)


  • Technical information
  • Data analysis
  • Software
  • Pictures
  • 2009 setup (Phase I)
‹ RICH up Technical information ›
»
  • Printer-friendly version
  • Login or register to post comments
Privacy and Security notice webmaster