jkadkins's blog
- Run12 Collins Analysis: Preliminary Plots for SPIN 2014 - October 4., 2014
- Draft Talk Slides for SPIN 2014 - October 8., 2014
- Update on Parton Matching - October 13., 2014
- Run12 Calibration: Further HT Geometry Study - November 11., 2014
- Run12 Calibration: Triggering Options - November 14., 2014
- Run12 Calibration: New Fits - December 15., 2014
- SPIN 2014 Proceedings - December 17., 2014
- Run14 BEMC Tower Id Swaps - December 19., 2014