EPD run preparation

 Most important:

a) Before the beam

1. Light test
2. 7 pattern test
3. Pedestal checks
4. V_ped test
5. Cosmics 

b) With the beam start

6. Timing scan Maria and Joey

c) Monitoring:
1. Data Base changes
2. QA online plots
3. EPD Control GUI
4. Slow-Control Manual