- My blog
- Post new blog entry
- Top bloggers
- Recent posts
Sort by:[Date]
Run 19 EPD Calibrations for 7.3 GeV FXT (sNN 3.9 GeV)
Updated on Fri, 2023-01-27 11:32. Originally created by cracz on 2021-09-27 21:47.This comes from a calibration production that included days 107, 113, and 169.
Day 107 only included a single run and did not have enough statistics to calibrate.
Run21 EPD 'Live' Calibration day 178-184
Updated on Mon, 2021-09-27 17:04. Originally created by dchen on 2021-09-27 16:58.Issue: Empty tile 1:2:4 through day 180 to day 184
Three ranges for EPD calibration:
Run21 EPD 'Live' Calibration day 178-184
Updated on Mon, 2021-09-27 16:58. Originally created by dchen on 2021-09-27 16:58.Issue: Empty tile 1:2:4 through day 180 to day 184
Three ranges for EPD calibration:
Run21 EPD 'Live' Calibration day 178-184
Updated on Mon, 2021-09-27 16:58. Originally created by dchen on 2021-09-27 16:58.Issue: Empty tile 1:2:4 through day 180 to day 184
Three ranges for EPD calibration:
Run13 pp500 Endcap Dijet Preliminary Result
Updated on Tue, 2021-10-12 19:53. Originally created by jhkwas on 2021-09-27 15:08.
Trigger Board Run 2022
Updated on Tue, 2022-04-12 16:35. Originally created by oleg on 2021-09-27 10:26.Meetings: Monday 1pm EDT/EST
Missing high dE/dx in Run 21 3p85 GeV fixed target data with respect to Run 18 one.
Updated on Sun, 2021-09-26 11:20. Originally created by fisyak on 2021-09-26 11:20.
EPD Calibration Run19 31GeV FXT
Updated on Wed, 2021-12-01 20:32. Originally created by dchen on 2021-09-23 16:31.Dataset:
production name:
production_31GeV_fixedTarget_2019
Days: 189, 190
First run: 20189035