Sort by:[Date]

Digging for production changes after SL16d

Following up on the problematic JetCorr PWG findings...

Calibration status

Checking if the EPD is hanging safely

On 22 June 2018, we took down the EPD and hung it like 20 feet high on the East wall of the IR.  We did this with custom-built holders built from hardened steel at OSU.  We flex-tested it he

HF-PWG minutes 2018/09/20

Electron PID using a Likelihood method

EPD around Sept 2017

In mid-September, 2018, a look back at just....

.... one year ago...

eTOF Cable Route

 

a new unfolding including temrapature fluctuation

0919_PWG_hkato

 

Weekly Meeting (Sep. 17)

 ZZ: update
- Minghui: check correlation between pair energy ratio and energy ratio inside a cone