Sort by:[Date]

Run 15 BEMC Fit Results

 Attached are the fits of the MIP peaks for each tower for the Longitudinal and Transverse running periods of run 15 (LongMIP.pdf and TransMIP.pdf, respectively)

EPD Calibration Continued

 EPD calibration continues. As of now, I still only have working data from days 110-122 (excluding 115, which has no data). For those days, the following tasks have been performed:

Updated decile boundaries for ZDC and BBC ADC signals, from using HT1 trigger to minimum bias (MB) trigger

Ds check

 

Spin Meeting - Figures for Run12 Paper

PARP(91) tune study

From Carl's email

When Kevin and Zilong tuned Perugia 2012 to match the STAR 200 GeV pi^+/- cross
section, they initially looked at a couple of parameters that influence the MB
pion 

Weekly Meeting (July 23)

- Chong: pi0 calibration update
- Minghui: "big process" in finding out true information

STAR Collaboration Meeting: Jet cross section at 200 GeV

Error bands of functions fitted into data

Note:
There is also a function built in ROOT:

Preliminary Plots Approved by LFSUPC