Sort by:[Date]

OSU EPD Testbench, BES meeting March9 2015

 

pcb binding practice

 

AnalysisRun16066027

The detailed analysis of triggers for this run follows

pp2pp draft

Background estimation with slope ptbalance cut

 

Scaler rates first transverse fill

 

pp2pp figures

Documentation for Performing BEMC Gain Calibration

 The attached PDF gives instructions for running all of the code to peform a gain calibration on the BEMC.

Partonic pT plots - first look

The first plot is for partonic pt of 2-3 in one file in one run.

The second plot is for the partonic pt of 2-3 in all the files in all the runs.

STAR status run 15. March 5th, Spin PWG meeting