Summary of the provisions of Quality Assurance and Quality Control for the STAR Experiment
- Online QA (near real-time data from the event pool)
-
- Plots of hardware/electronics performance
- Histogram generation framework and browsing tools are provided
- Shift crew assigned to analyze
- Plots are archived and available via web
- Data can be re-checked
- Yearly re-assessment of plot contents during run preparation meetings and via pre-run email request by the QA coordinator
- Visualization of data
- Event Display (GUI running at the control room)
- DB data validity checks
- Plots of hardware/electronics performance
- FastOffline QA (full reconstruction within hours of acquisition)
-
- Histogram framework, browsing, reporting, and archiving tools are provided
- QA shift crew assigned to analyze and report
- Similar yearly re-assessment of plot contents as Online QA plots
- Data and histograms on disk for ~2 weeks and then archived to HPSS
- Available to anyone
- Variety of macros provided for customized studies (some available from histogram browser, e.g. integrate over runs)
- Archived reports always available
- Report browser provided
- Histogram framework, browsing, reporting, and archiving tools are provided
- Reconstruction Code QA
-
- Standardized test suite of numerous reconstruction chains in DEV library performed nightly
- Analyzed by S&C team
- Browser provided
- Results kept at migration to NEW library
- Standardized histogram suite recorded at library tagging (2008+)
- Analyzed by S&C team
- Test suite grows with newly identified problem
- Discussions of analysis and new issues at S&C meetings
- Test productions before full productions (overlaps with Production QA below)
- Provided for calibration and PWG experts to analyze (intended to be a requirement of the PWGs, see Production cycles and QA procedure under Proposal for Run IV)
- Available to anyone for a scheduled 2 weeks prior to commencing production
- Discussions of analysis and new issues at S&C meetings
- Standardized test suite of numerous reconstruction chains in DEV library performed nightly
- Production QA
-
- All aspects of FastOffline QA also provided for Production QA (same tools)
- Data and histograms are archived together (i.e. iff data, then histograms)
- Same yearly re-assessment of plot contents as FastOffline QA plots (same plots)
- Formerly analyzed during runs by persons on QA shift crew (2000-2005)
- No current assignment of shift crew to analyze (2006+)
- Visualization of data
- Event Display: GUI, CLI, and visualization engine provided
- See "Test productions before full production" under Reconstruction Code QA above (overlaps with Production QA)
- Resulting data from productions are on disk and archived
- Available to anyone (i.e. PWGs should take interest in monitoring the results)
- All aspects of FastOffline QA also provided for Production QA (same tools)
- Embedding QA
-
- Standardized test suite of plots of baseline gross features of data
- Analyzed by Embedding team
- Provision for PWG specific (custom) QA analysis (2008+)
- Standardized test suite of plots of baseline gross features of data
»