Gate timing for the 2018 Au+Au 27 GeV run

Executive summary:

run12 pp200 5-point Endcap Jets Neutral Fraction

 

Run11 Upsilon for QM2018 discuss

 

mass2_7GeV

EPD hit positions when a BBC tile sees nothing

In the isobar runs at 200 GeV, the BBC high voltage was set low, in order to maximize its dynamic range.  This means that it may miss single MIPs that pass through it.  We are reverting to n

Pre_QM_reply

QM poster Lc_optimization_v10

 

poster darft ver2

 

poster draft2

 

AOB

Speaker : All ( All )


Talk time : 12:40, Duration : 00:20
  • 54 GeV dataset picoDST restored in  Xrootd as P17ii but we also have the reproduced P18ic on central disk

muDST to picoDST production

Speaker : Levente Hajdu ( BNL )


Talk time : 12:20, Duration : 00:20

STAR DB Farms: Upgrade to SL7

Speaker : Dmitry Arkhipkin ( BNL )


Talk time : 12:00, Duration : 00:20

Software and Computing Meeting

2018-05-09 12:00
2018-05-09 13:00
America/New York
Wednesday, 9 May 2018
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00STAR DB Farms: Upgrade to SL7 ( 00:20 ) 1 fileDmitry Arkhipkin (BNL)
12:20muDST to picoDST production ( 00:20 ) 0 filesLevente Hajdu (BNL)
12:40AOB ( 00:20 ) 0 filesAll (All)

triton_b3_200GeV

Uniformity (and nonuniformity) ring-by-ring

There have been several studies of the uniformity of the EPD response.  Now that we really get into the fine details, I came up with another representation that I think is best.  Those who c

QM poster Lc_optimization_v9

 

Code QA

Speaker : Long


Talk time : 11:53, Duration : 00:20

 

D0 spectra preliminary plots for QM18

QM poster Lc_optimization_v8

 

WPCF 2018 talk