eSTAR
2012-11-13 12:00
2012-11-13 13:00
America/New York
Tuesday, 13 November 2012
EVO 14 3853 (Tuesday 10/02 noon), at 17:00 (GMT), duration : 01:00
EVO 14 3853 (Tuesday 10/02 noon), at 17:00 (GMT), duration : 01:00
Agenda:
a) STAR R&D review reports (Flemming)
http://drupal.star.bnl.gov/STAR/system/files/STAR%20R%2526D%202013%20closeout_final_management.pdf
b) FSC progress, EIC R&D proposal (Oleg et al.)
http://drupal.star.bnl.gov/STAR/system/files/Nov-2012-Calo-Proposal.pdf
b.2) FCS simulations: (Len)
http://drupal.star.bnl.gov/STAR/system/files/FCS_2.pdf
c) iTPC simulation update (Hui)
http://www.star.bnl.gov/protected/bulkcorr/wanghui6/iTPC/high_pt
d) eSTAR simulation with iTPC (Ming)
http://www.star.bnl.gov/protected/lfspectra/swing/eSTAR/eSTAR_20121016.pptx
e) iTPC progress (Zhangbu)
1) draft in progress (most just plots and pictures)
need help/inputs as shown in the table of contents
http://drupal.star.bnl.gov/STAR/system/files/STAR_InnerTPC_Sectors_Upgrade_11132012.pdf
2) additional information about wire chamber facility in Shandong University;
the same group is also proposing an upgrade for ATLAS
http://drupal.star.bnl.gov/STAR/system/files/zhucg-LHC-Conference.ppt
f) UCLA upgrade workshop agenda and goals (actively updated recently)
Saturday Afternoon session:
http://drupal.star.bnl.gov/STAR/meetings/star-analysis-meeting-nov-28-dec-3-2012/star-upgrade-workshop
Sunday Sessions:
http://drupal.star.bnl.gov/STAR/conference/timetable/talk/25638/5
g) EIC R&D calls in December 13-14, proposal due yesterday (11/12/2012)
http://www.star.bnl.gov/HyperNews-star/protected/get/estar/125/1.html
If you have additional items to discuss, please let us know.
Ernst and Zhangbu
a) STAR R&D review reports (Flemming)
http://drupal.star.bnl.gov/STAR/system/files/STAR%20R%2526D%202013%20closeout_final_management.pdf
b) FSC progress, EIC R&D proposal (Oleg et al.)
http://drupal.star.bnl.gov/STAR/system/files/Nov-2012-Calo-Proposal.pdf
b.2) FCS simulations: (Len)
http://drupal.star.bnl.gov/STAR/system/files/FCS_2.pdf
c) iTPC simulation update (Hui)
http://www.star.bnl.gov/protected/bulkcorr/wanghui6/iTPC/high_pt
d) eSTAR simulation with iTPC (Ming)
http://www.star.bnl.gov/protected/lfspectra/swing/eSTAR/eSTAR_20121016.pptx
e) iTPC progress (Zhangbu)
1) draft in progress (most just plots and pictures)
need help/inputs as shown in the table of contents
http://drupal.star.bnl.gov/STAR/system/files/STAR_InnerTPC_Sectors_Upgrade_11132012.pdf
2) additional information about wire chamber facility in Shandong University;
the same group is also proposing an upgrade for ATLAS
http://drupal.star.bnl.gov/STAR/system/files/zhucg-LHC-Conference.ppt
f) UCLA upgrade workshop agenda and goals (actively updated recently)
Saturday Afternoon session:
http://drupal.star.bnl.gov/STAR/meetings/star-analysis-meeting-nov-28-dec-3-2012/star-upgrade-workshop
Sunday Sessions:
http://drupal.star.bnl.gov/STAR/conference/timetable/talk/25638/5
g) EIC R&D calls in December 13-14, proposal due yesterday (11/12/2012)
http://www.star.bnl.gov/HyperNews-star/protected/get/estar/125/1.html
If you have additional items to discuss, please let us know.
Ernst and Zhangbu
eSTAR
Updated on Mon, 2012-11-12 09:33. Originally created by xzb on 2012-11-12 09:33. 2012-10-30 12:00
2012-10-30 13:00
America/New York
Tuesday, 30 October 2012
EVO 14 3853 (Tuesday 10/02 noon), at 16:00 (GMT), duration : 01:00
EVO 14 3853 (Tuesday 10/02 noon), at 16:00 (GMT), duration : 01:00
Run 9 200GeV Endcap Jet Pt Correction Test: New Production
First look at jet pt corrections in the Endcap using the new production and analysis trigger scheme ...
UCLA Analysis Meeting Talk
My talk for the analysis meeting at UCLA. Please see highest version number for latest draft.
upgrades for HF in star
I am givinf a talk at the Utrecht workshop on the STAR upgrades.
Draft talk is ataatched.
incorporating PXLs in the alignment chain
Updated on Fri, 2012-11-09 11:52. Originally created by bouchet on 2012-11-09 11:52.ARC-II layout snapshot 11/8/2012
Updated on Fri, 2012-11-09 10:59. Originally created by gvisser on 2012-11-09 10:59.D0 and D* in p+p 200 GeV data points
The following differential charm cross section at mid-rapidity are obtained from low pT D0 and high pT D* invariant yields scaled by charm fragmentation ratios 0.565 and 0.224, respectively:
Intent to publish 2006 EEMC pi0 paper
Title:
Neutral pion cross section and spin asymmetries at forward rapidity in polarized proton collisions at \sqrt{s} = 200 GeV.
Eemc pi0 Cross Section -- Nov 7 Update
The cross section results updated with the BFC filter contribution to the trigger efficiency.
FGT cosmic ray test setup -20121107
The FGT cosmic ray test setup, from top to bottom is quadrant 37, 35 and 31.
Run 9 Detector and Particle Levels Dijets
The comparison between jets created from the Run 9 pp500 data and from the detector level embedded simulation has displa