More?


Talk time : 12:00, Duration : 00:20

SSD Electronics

Speaker : Micheal


Talk time : 11:40, Duration : 00:20

IST

Speaker : Gerrit


Talk time : 11:20, Duration : 00:20

Phase I Testing

Speaker : Michal


Talk time : 11:00, Duration : 00:20

Pixel Electrical

Speaker : Leo


Talk time : 10:40, Duration : 00:20

Pixel Mechanical

Speaker : Howard W.


Talk time : 10:20, Duration : 00:20

News

Speaker : Flemming


Talk time : 10:00, Duration : 00:20

Dalitz decays in starsim

Speaker : Thomas Ullrich ( BNL )


Talk time : 12:40, Duration : 00:10

run9 500 GeV BTOW relative gains calibration

The purpose of this analysis is to calculate the relative gains in the BTOW. The slopes of each individual tower was calculated by Justin according to the W-algo wiki using Scott's method.

AOB

Speaker : All ( All )


Talk time : 12:50, Duration : 00:10

Previous You do not have access to view this node list.

Opened AOBs are:

NPE analysis & embedding opened discussions

Speaker : TBC ( TBC )


Talk time : 12:35, Duration : 00:15

We should discuss

Geometry differential, an update

Speaker : Victor Perevoztchikov ( BNL )


Talk time : 12:15, Duration : 00:20

SVT simulator tuning and embeding

Speaker : Stephen Baumgart ( Yale )


Talk time : 12:00, Duration : 00:15

Software and Computing phone meeting

2009-06-10 12:00
2009-06-10 13:00
Etc/GMT-5
Wednesday, 10 June 2009
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00SVT simulator tuning and embeding ( 00:15 ) 1 fileStephen Baumgart (Yale)
12:15Geometry differential, an update ( 00:20 ) 0 filesVictor Perevoztchikov (BNL)
12:35NPE analysis & embedding opened discussions ( 00:15 ) 0 filesTBC (TBC)
12:40Dalitz decays in starsim ( 00:10 ) 1 fileThomas Ullrich (BNL)
12:50AOB ( 00:10 ) 0 filesAll (All)

Information on the NPE (past) analysis and path forward

Quick start

Comparison of conversion rates in MC to data, take 1

Abstract: We compare the conversion rate for simulated π0 events in the 1st radiator of the endcap to data.  We find a conversion rate of 90% +/- 2% for the simulation, compared with 91.5% +/- 0.3% for the data, where we count any signal w/in R<0.3 of the pion candidate as a conversion.
 
Contents:
 

2009 BSMD Status for 500 GeV Run

The BSMD status analysis for the 500 GeV data proceeds in two steps.  First, each strip is assigned a status for the whole run from an analysis of fills 10399, 10402, 10403, 10404, 10407, 1041

ZDC simulation with enhanced resoluton

I changed the simulation to be able to read out each SMD strip individually so there are 21 by 32 bins instead of 7 by 8.  This required a new binning configuration so I created two; one

ZDC Simulation files and documentation

The simulations consists of three files:
phiAsymmetry_Sim*.C   generates the simulated coincidence histograms.

BSMD energy scale uncertainty

1. Dataset

  • 2005 p+p HighTower-1 data
  • Single-particle Monte Carlo simulation
  • Default cluster finder
Topic