More?
Updated on Wed, 2009-04-29 18:58. Originally created by matis on 2009-04-29 18:58.Talk time : 12:00, Duration : 00:20
BLM
Updated on Thu, 2009-04-30 12:07. Originally created by matis on 2009-04-29 18:57.Speaker : Howard M.
Talk time : 11:40, Duration : 00:20
IST
Updated on Wed, 2009-04-29 18:43. Originally created by matis on 2009-04-29 18:43.Speaker : Gerrit
Talk time : 11:20, Duration : 00:20
Phase I Testing
Updated on Wed, 2009-04-29 18:43. Originally created by matis on 2009-04-29 18:43.Speaker : Michal
Talk time : 11:00, Duration : 00:20
Pixel Electrical
Updated on Wed, 2009-04-29 18:42. Originally created by matis on 2009-04-29 18:42.Speaker : Leo
Talk time : 10:40, Duration : 00:20
Pixel Mechanical
Updated on Wed, 2009-04-29 18:41. Originally created by matis on 2009-04-29 18:40.Speaker : Eric
Talk time : 10:20, Duration : 00:20
News
Updated on Wed, 2009-04-29 18:39. Originally created by matis on 2009-04-29 18:38.Speaker : Flemming
Talk time : 10:00, Duration : 00:20
AOB
Updated on Wed, 2009-04-29 10:17. Originally created by jeromel on 2009-04-29 09:30.Speaker : All ( All )
Talk time : 12:55, Duration : 00:10
Previous list was at You do not have access to view this node.
Vertex finding update for d+Au 200 GeV
Updated on Wed, 2009-04-29 12:14 by tone421. Originally created by jeromel on 2009-04-29 09:21.Speaker : Anthony Timmins ( WSU )
Talk time : 12:35, Duration : 00:20
Related documents include
-
Possible pile-up cut for d+Au 200 GeV.. (Hypernews post)
Update on the early/prompt hits
Updated on Wed, 2009-05-27 10:48 by testadmin. Originally created by jeromel on 2009-04-29 09:18.Speaker : Pibero Djawotho ( TAMU )
Talk time : 12:15, Duration : 00:20
http://www.star.bnl.gov/protected/spin/pibero/dijets/2009.02.13/ »
Drupal upgrade, status and plan forward
Updated on Wed, 2009-04-29 10:54 by chajecki. Originally created by jeromel on 2009-04-29 09:12.Speaker : Zbigniew Chajecki ( OSU )
Talk time : 12:00, Duration : 00:15
Current status:
Software and Computing phone meeting
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | Drupal upgrade, status and plan forward ( 00:15 ) 0 files | Zbigniew Chajecki (OSU) |
12:15 | Update on the early/prompt hits ( 00:20 ) 0 files | Pibero Djawotho (TAMU) |
12:35 | Vertex finding update for d+Au 200 GeV ( 00:20 ) 2 files | Anthony Timmins (WSU) |
12:55 | AOB ( 00:10 ) 0 files | All (All) |
upgrade of STAR Drupal to v.6.10 - status
Updated on Wed, 2009-04-29 10:53. Originally created by chajecki on 2009-04-28 23:46.We performed a test upgrade of our STAR drupal to v6.10 (from 5.2).
2009.04.28 LDA plus SMD analysis with pre-shower sorting
Cut optimization with Fisher's LDA classifier
ROOT implementation for LDA:
2009 APS Talk
Updated on Fri, 2009-05-01 16:51. Originally created by fersch on 2009-04-28 07:16..pdf files attached
APS April Meeting Hadron A_LL talk
Updated on Wed, 2009-05-06 08:09. Originally created by seelej on 2009-04-27 20:51.Find APS April Meeting Hadron A_LL talk attached
APS April Meeting W Talk
Updated on Wed, 2009-05-06 08:09. Originally created by seelej on 2009-04-27 20:49.Find APS April Meeting W talk attached
DELETE - Run 9 BSMD Status Update 4 (4/27)
Updated on Thu, 2009-05-14 04:19. Originally created by wleight on 2009-04-27 17:33. Under:After further investigations -- specifically looking at strips that had a significant secondary peak, entirely separated from the main peak, with a max of ~40, which were not being caught by my cut
Crate systematic for 2006
Updated on Tue, 2009-04-28 09:24. Originally created by mattheww on 2009-04-27 09:59.Summary
An analysis of the crate variations results in a crate systematic of 0.9%. This increases the total calibration uncertainty to 1.6%.
Detailed Explanation:
A survey of lower energy p+p data and their
Updated on Sun, 2009-04-26 11:56. Originally created by videbaks on 2009-04-26 11:55.Document prepared for the Beam Energy Scan focus group. (run-10 BUR)
Document date March 2009