WaferConfiguration Table

 In the possibility to rerun year 7 data, an improvement of SSD data can be added.

STAR Regional Collaboration Meetings

Underlying Event APS Talk

Underlying Event APS Talk

DELETE - Run 9 BSMD Status Update 3 (4/24)

Under:

After looking more closely at the crate 1 channels I was forced to make serious revisions to status bit 2 from the previous update.  The new status bit 2 test is as follows:

CHEP 2009 Paper Drafts

Here is v03 of my conference proceedings.

Run 9 Spin QA

A. Regarding possible "Spin QA" of Run 9 200 GeV ... attached is a draft (all I could find) of the plots and procedures we had for Run 6 as an example.

Run 9 JP Rate Test

Run 9 JP Rate Test

Final Run 9 500 GeV BSMD Status - Willie Leight

Under:

BSMD Pedestals and Status for Run 9 pp 500 Data (June 2009, uploaded to offline DB)

The BSMD status analysis for the 500 GeV data proceeds as follows:

Anymore?


Talk time : 13:20, Duration : 00:20

Results of preliminary placement of BLM

Speaker : Howard M.


Talk time : 13:00, Duration : 00:20

Tracking Performance of a 18 and 20 ladder SSD

Speaker : Jim


Talk time : 12:40, Duration : 00:20

Layouts of a 18 and 20 Ladder SSD

Speaker : Eric


Talk time : 12:20, Duration : 00:20

Pros and Cons of Changing Radius and # of SSD Ladders

Speaker : Howard M.


Talk time : 12:00, Duration : 00:20

SSD Electronics upgrade

Speaker : Micheal


Talk time : 11:40, Duration : 00:20

IST

Speaker : Gerrit


Talk time : 11:20, Duration : 00:20

Phase I Testing

Speaker : MIchal


Talk time : 11:00, Duration : 00:20

Pixel Electrical

Speaker : Leo


Talk time : 10:40, Duration : 00:20

Pixel Mechanical

Speaker : Eric


Talk time : 10:20, Duration : 00:20

News

Speaker : Flemming


Talk time : 10:00, Duration : 00:20

QA of BTOW + ETOW peds + status tables in DB , pp 500

 This blog keeps track of incremental improvement of BTOW +ETOW peds & status tables.