Database

Under:

These pages describe how to use the Barrel TOF (including VPD) database.

STAR Grid Activities meeting

2009-01-15 13:00
2009-01-15 14:00
Etc/GMT-4
Thursday, 15 January 2009
510/1-189 (see agenda for phone), at 18:00 (GMT), duration : 01:00

Meeting topics:

- Sites status from admins' and users' perspectives.
--- Condor upgrade at BNL (Any info from Chris or schedule in mind?)
--- WSU/PDSF problem with configuring multiple CEMon/BDII collectors (Liz/Iwona)
--- PDSF site status with upgrades and configuration changes

- EC2/Amazon/Virtualization


- KISTI and networking

--- next step - installation of software on DAQ nodes?


- AOB?

 

In the US, call 1-605-475-8500

Enter Conference Room Number : 5343115
Skype +99008275343115

International, call
In Austria: 0820 4000 1572
In Belgium: 070 35 9987
In France: 0826 100 275
In Germany 01805 00 7646
In Ireland: 0818 270 032
In Italy: 0848 390 172
In Spain: 0902 886 048
In Switzerland: 0848 560 152
In UK: 0870 738 0760
In Netherlands: 0870 001 931

Enter Conference Room Number : 5343115
Skype +99008275343115

 

 

VPD local polarimetry states update

Speaker : Ramon Cendejas


Talk time : 00:00, Duration : 00:20

Spin Physics PWG meeting

2009-01-15 12:00
2009-01-15 13:30
Etc/GMT-4
Thursday, 15 January 2009
phone 317-263-8800 1 077795# 1, at 17:00 (GMT), duration : 01:30

  Agenda may be found here

 

TimeTalkPresenter
00:00VPD local polarimetry states update ( 00:20 ) 1 fileRamon Cendejas

L2 code release

 I've wrapped up a set of changes to the L2 algorithms:

Assignments in preparation for upcoming review

Speaker : Howard Matis


Talk time : 11:50, Duration : 00:45

SSD schedule

Speaker : all


Talk time : 10:50, Duration : 01:00

Repair of the Ladder

Speaker : Stéphane Bouvier


Talk time : 10:10, Duration : 00:40

Test Bench for the upgraded system

Speaker : Christophe Renard


Talk time : 09:30, Duration : 00:40

HFT Review and HFT Schedule

Speaker : Howard Matis


Talk time : 09:00, Duration : 00:30

SSD meeting to prepare for HFT review - day 3

2009-01-22 09:00
2009-01-22 12:30
Etc/GMT-4
Thursday, 22 January 2009
Nantes Subatech; Jan 20-22; telephone bridge (510) 486-7333, at 14:00 (GMT), duration : 03:30
TimeTalkPresenter
09:00HFT Review and HFT Schedule ( 00:30 ) 2 filesHoward Matis
09:30Test Bench for the upgraded system ( 00:40 ) 0 filesChristophe Renard
10:10Repair of the Ladder ( 00:40 ) 1 fileStéphane Bouvier
10:50SSD schedule ( 01:00 ) 0 filesall
11:50Assignments in preparation for upcoming review ( 00:45 ) 0 filesHoward Matis

Mechanical Issues

Speaker : Howard Matis, Gerard Guilloux, and others


Talk time : 10:55, Duration : 00:30

Radiation Levels in the HFT area

Speaker : Howard Matis


Talk time : 09:30, Duration : 00:45

FGT requirements

Speaker : Howard Matis


Talk time : 09:00, Duration : 00:30

The Cone Assembly and integration with the HFT

Speaker : Eric Anderson


Talk time : 10:30, Duration : 00:40

SSD meeting to prepare for HFT review - day 2

2009-01-21 09:00
2009-01-21 12:30
Etc/GMT-4
Wednesday, 21 January 2009
Nantes Subatech; Jan 20-22; telephone bridge (510) 486-7333 Times are BNL time, at 14:00 (GMT), duration : 03:30
TimeTalkPresenter
09:00FGT requirements ( 00:30 ) 2 filesHoward Matis
09:30Radiation Levels in the HFT area ( 00:45 ) 1 fileHoward Matis
10:15 --- break --- ( 00:15 ) 0 files
10:30The Cone Assembly and integration with the HFT ( 00:40 ) 2 filesEric Anderson
10:55Mechanical Issues ( 00:30 ) 0 filesHoward Matis, Gerard Guilloux, and others

Cooling

Speaker : Jim Thomas


Talk time : 11:10, Duration : 00:20

Slow controls

Speaker : Micheal LeVine


Talk time : 10:50, Duration : 00:20

Hardware implementation for slow controls

Discussion of required software changes to existing system

DAQ interface

Speaker : Micheal LeVine


Talk time : 10:40, Duration : 00:10

Hardware interface to STAR DAQ and anticipated work necessary to adapt TPX software to our needs.

Tools for circuit design and layout -- Subatech and BNL

Speaker : Bob Scheetz, Chistophe Renard, Micheal LeVine


Talk time : 10:30, Duration : 00:10

Discuss the tools being used at Subatech to generate schematics, the tools for PCB layout and routing in use at BNL, and a roadmap to get from one set to the other