20080922_bgJetsPre1lt0_01__20080922_gJetPre1lt0_01__20080922_pp06lPre1lt0_01__counts_smdPeakDataRotated_pt1gt7pt2gt5_noPi0Cuts_1
Updated on Mon, 2008-09-22 18:28. Originally created by seluzhen on 2008-09-22 18:28.20080922_bgJetsPre1lt0_01__20080922_gJetPre1lt0_01__20080922_pp06lPre1lt0_01__counts_maxResidualUV_pt1gt7pt2gt5_noPi0Cuts_1D
Updated on Mon, 2008-09-22 18:28. Originally created by seluzhen on 2008-09-22 18:28.20080922_bgJetsPre1lt0_01__20080922_gJetPre1lt0_01__20080922_pp06lPre1lt0_01__counts_energy3x3Tower_pt1gt7pt2gt5_noPi0Cuts_1D
Updated on Mon, 2008-09-22 18:27. Originally created by seluzhen on 2008-09-22 18:27.WBS/Schedule/AOB
Updated on Mon, 2008-09-22 17:20. Originally created by balewski on 2008-09-22 17:20.Infrastructure needs
Updated on Fri, 2008-09-26 13:23 by dkoetke. Originally created by balewski on 2008-09-22 17:19.Reference
Speaker : Valpo (Koetke, Nord)
Talk time : 16:30, Duration : 01:00
Coffee break
Updated on Tue, 2008-09-23 08:29 by surrow. Originally created by balewski on 2008-09-22 17:18.Reference
Talk time : 15:00, Duration : 00:20
Integration design status
Updated on Tue, 2008-09-23 08:30 by surrow. Originally created by balewski on 2008-09-22 17:17.Simulation status
Updated on Fri, 2008-09-26 14:08. Originally created by balewski on 2008-09-22 17:15.Reference
Speaker : Jan
Talk time : 14:00, Duration : 01:00
List of software tasks :
Lunch break
Updated on Tue, 2008-09-23 08:29 by surrow. Originally created by balewski on 2008-09-22 17:15.Reference
Talk time : 12:30, Duration : 01:30
DAQ design status
Updated on Fri, 2008-09-26 01:08 by gvisser. Originally created by balewski on 2008-09-22 17:14.Coffee break
Updated on Tue, 2008-09-23 08:28 by surrow. Originally created by balewski on 2008-09-22 17:13.Reference
Talk time : 11:00, Duration : 00:30
FEE design
Updated on Thu, 2008-09-25 11:44. Originally created by balewski on 2008-09-22 17:12.Status of triple GEM
Updated on Fri, 2008-09-26 12:49. Originally created by balewski on 2008-09-22 17:10.Reference
Speaker : Doug
Talk time : 09:00, Duration : 01:00
design work, GEM foil test, charge sharing prototype
FGT meeting at BNL
Updated on Wed, 2008-09-24 20:31. Originally created by balewski on 2008-09-22 17:07. 2008-09-26 00:00
2008-09-26 18:00
Etc/GMT-5
Friday, 26 September 2008
STAR experiment meeting (trailer), at 04:00 (GMT), duration : 18:00
STAR experiment meeting (trailer), at 04:00 (GMT), duration : 18:00
BOOKED a meeting in EVO (http://evo.caltech.edu).
Title: FGT meeting at BNL
Description: FGT
Community: STAR
Eastern Daylight Time (-0400)
Start 2008-09-26 08:30
End 2008-09-26 18:30
- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavtvaaMauInaiIt
- Phone Bridge
ID: 528847
EVO Phone Bridge Telephone Numbers:
- USA (Caltech, Pasadena, CA) +1 626 395 2112
- Germany (DESY, Hamburg) +49 40 8998 1340
- USA (BNL, Upton, NY) +1 631 344 6100
Time | Talk | Presenter |
---|---|---|
09:00 | Status of triple GEM ( 01:00 ) 5 files | Doug |
10:00 | FEE design ( 01:00 ) 0 files | Miro |
11:00 | Coffee break ( 00:30 ) 0 files | |
11:30 | DAQ design status ( 01:00 ) 1 file | Gerard / ANL |
12:30 | Lunch break ( 01:30 ) 0 files | |
14:00 | Simulation status ( 01:00 ) 1 file | Jan |
15:00 | Coffee break ( 00:20 ) 0 files | |
15:30 | Integration design status ( 01:00 ) 0 files | Jim |
16:30 | Infrastructure needs ( 01:00 ) 1 file | Valpo (Koetke, Nord) |
17:30 | WBS/Schedule/AOB ( 00:30 ) 0 files | Bernd |
TPC Phone Meeting
Updated on Mon, 2008-09-22 15:52. Originally created by witt on 2008-09-22 15:52. 2008-10-06 15:40
2008-10-06 16:40
Etc/GMT-4
Monday, 6 October 2008
Phone, at 19:40 (GMT), duration : 01:00
Phone, at 19:40 (GMT), duration : 01:00
NPE tagged D0 measurement in Cu+Cu 200 GeV
Updated on Sat, 2008-09-27 15:38 by agerom. Originally created by suaide on 2008-09-22 14:34.Reference
Speaker : Artemios and Raghunath
Talk time : 16:30, Duration : 00:15
Pythia tune for heavy flavor
Updated on Wed, 2008-09-24 17:06 by ullrich. Originally created by suaide on 2008-09-22 14:25.Reference
Speaker : Thomas Ullrich
Talk time : 17:45, Duration : 00:15
BSMD studies
Updated on Mon, 2008-09-29 09:01 by mattheww. Originally created by genevb on 2008-09-22 14:18.Speaker : J. Balewski (MIT)
Talk time : 11:00, Duration : 01:00
data volume (strips)
Updated on Tue, 2008-09-30 16:19. Originally created by bouchet on 2008-09-22 12:42.Number of strips fired per wafer and per side :
Cut Variation Tests
Goal:
To test the stability of the cross section measurement to changes in the analysis cuts and, if necessary, assign a systematic uncertainty for cut variations.