20080708_pp06l2gNoPre1cuts__counts_ptGamma_pt1gt7pt2gt5_m_notInPi0region_dist_pre1only_log

20080708_pp06l2gNoPre1cuts__counts_ptGamma_pt1gt7pt2gt5_m_notInPi0region_dist_pre1only_log

20080708_pp06l2gNoPre1cuts__counts_invMass_pt1gt7pt2gt5_noPi0Cuts_dist_pre1only_log

20080708_pp06l2gNoPre1cuts__counts_invMass_pt1gt7pt2gt5_noPi0Cuts_dist_pre1only_log

20080707_pp06l2gPre1lt5MeV__showerShapes_meanE_vStrip_pt1gt7pt2gt5_noPi0Cuts_scalePeak_logy

20080707_pp06l2gPre1lt5MeV__showerShapes_meanE_vStrip_pt1gt7pt2gt5_noPi0Cuts_scalePeak_logy

20080707_pp06l2gPre1lt5MeV__showerShapes_meanE_vStrip_pt1gt7pt2gt5_m_pi0region_scalePeak_logy

20080707_pp06l2gPre1lt5MeV__showerShapes_meanE_vStrip_pt1gt7pt2gt5_m_pi0region_scalePeak_logy

20080707_pp06l2gPre1lt5MeV__showerShapes_meanE_vStrip_pt1gt7pt2gt5_m_notInPi0region_scalePeak_logy

20080707_pp06l2gPre1lt5MeV__showerShapes_meanE_vStrip_pt1gt7pt2gt5_m_notInPi0region_scalePeak_logy

20080707_pp06l2gPre1lt5MeV__counts_invMass_pt1gt7pt2gt5_noPi0Cuts_dist_pre1only_log

20080707_pp06l2gPre1lt5MeV__counts_invMass_pt1gt7pt2gt5_noPi0Cuts_dist_pre1only_log

Overview for generating EEMC pedestals and status tables

Under:

This is an informal overview of the 'philosophy' used to generate pedestals and status tables for the STAR endcap EMC, a

10) SMD-P gain equalization , ver 1.1

Under:

Goal : predict BSMD-P relative gain corrections for every eta bin 

Method : find average slope per eta slice, fit gauss, determine average slope : avrSlope(iEta)

Disc. item 3: Makeup/schedule for Standing Technical Committee

Speaker : all


Talk time : 15:20, Duration : 00:30

Disc. item 2: Commissioning & Testing needs of Sub systems

Speaker : all


Talk time : 14:50, Duration : 00:30

Disc. item 2: Commissioning & Testing needs of Sub systems

Speaker : all


Talk time : 14:50, Duration : 00:30

Discussion Item 1: Assembly/maintanance space needs of

Speaker : all


Talk time : 14:20, Duration : 00:30

Further discussion of Strawman Int. plans/Schedules

Speaker : all


Talk time : 14:00, Duration : 00:20

Discussion

Strawman for Integration plans/Schedules

Speaker : Bernd Surrow ( MIT )


Talk time : 11:00, Duration : 00:20

East end Real Estate for HFT installation

Speaker : Howard Wieman ( LBNL )


Talk time : 10:40, Duration : 00:20

Cone Mechanical/Integration

Speaker : Eric Andersen


Talk time : 10:20, Duration : 00:20

FGT West Support Cone E-field calculations

Speaker : Dick Majka


Talk time : 10:00, Duration : 00:20

Mech. design of support struct. & Triple GEM detectors FGT

Speaker : Jim Kelsey ( MIT )


Talk time : 09:40, Duration : 00:20

General req. on space & Dead Material including schedule FGT

Speaker : Jan Balewski


Talk time : 09:20, Duration : 00:20

 Bernd show most of the slides from 

Here are my slides as PDF

Radiation measurements from run9

Speaker : Howard Matis


Talk time : 09:10, Duration : 00:10

Discussion on plans for rad measurements in the upcoming run