Welcome and review of Agenda

Speaker : Bill Christie ( BNL )


Talk time : 09:00, Duration : 00:10

Star Integration meeting

2008-07-23 00:00
Etc/GMT-5
Wednesday, 23 July 2008
Star exp conference room at 1006, at 04:00 (GMT), duration : 00:00
Meeting to discuss progress in defined envelope of future STAR upgrades
TimeTalkPresenter
09:00Welcome and review of Agenda ( 00:10 ) 0 filesBill Christie (BNL)
09:10Radiation measurements from run9 ( 00:10 ) 1 fileHoward Matis
09:20General req. on space & Dead Material including schedule FGT ( 00:20 ) 0 filesJan Balewski
09:40Mech. design of support struct. & Triple GEM detectors FGT ( 00:20 ) 0 filesJim Kelsey (MIT)
10:00FGT West Support Cone E-field calculations ( 00:20 ) 2 filesDick Majka
10:20Cone Mechanical/Integration ( 00:20 ) 1 fileEric Andersen
10:40East end Real Estate for HFT installation ( 00:20 ) 1 fileHoward Wieman (LBNL)
11:00Strawman for Integration plans/Schedules ( 00:20 ) 0 filesBernd Surrow (MIT)
14:00Further discussion of Strawman Int. plans/Schedules ( 00:20 ) 0 filesall
14:20Discussion Item 1: Assembly/maintanance space needs of ( 00:30 ) 0 filesall
14:50 Disc. item 2: Commissioning & Testing needs of Sub systems ( 00:30 ) 0 filesall
14:50 Disc. item 2: Commissioning & Testing needs of Sub systems ( 00:30 ) 0 filesall
15:20Disc. item 3: Makeup/schedule for Standing Technical Committee ( 00:30 ) 0 filesall

QA part II (Low Luminosity)

I have analysed the  "Low Luminosity"  production P08ic  (without any cuts) that was just produced with SVT+SSD+TPC and TPC only:

 

13) ver 1.2 : SMD-E, -P, status & relative gains, no Crate4

Under:

Automatic BSMD-E, -P   relative calibration and status tables. 

The second pass through both SMDE, SMDP was performed, learning from previous mistakes.

Main changes:

Hadronization/Underlying Event Systematic for 2005+2006 jet aLL Part II

In Part I of this blog I discussed the porting of the Hadronization and Underlying Event stand-alone pythia code, originally written by Mike Miller, to RCF and the various tests used to determine t

09) QA of SMD-P slopes, ver1.1

Under:

Automatic QA of BSMD-P minB spectra. 

Content

details about known hardware problems

Under:

Attached file  'SMD_07.xls'  contain  my notes from run 7, the only things that might be useful for

Electrostatic Calculations for West Support Cone

Under:

 Hi all;
 I've put some results from the latest electrostatic
calculations for the WSC at:

update on Y4@200GeV/c Pion - Proton spherical harmonics - cut comparison

Speaker : Marcin Zawisza ( WUT )


Talk time : 00:00, Duration : 00:20

http://www.star.bnl.gov/protected/hbt/zawisza/080707/index.html

test last commit

A bug fix was provided by Valeri to fill correctly the ssd  daq adc and strip data

08) SMD-E gain equalization , ver 1.1

Under:

Goal : predict BSMD-E relative gain corrections for every eta bin 

Method : find average slope per eta slice, fit gauss, determine average slope : avrSlope(iEta)

07) QA method for SMD-E, slopes , ver1.1

Under:

Automatic QA of BSMDE minB spectra. 

Content

STAR HBT meeting

2008-07-18 10:00
2008-07-18 12:00
Etc/GMT-5
Friday, 18 July 2008
, at 14:00 (GMT), duration : 02:00
TimeTalkPresenter
00:00update on Y4@200GeV/c Pion - Proton spherical harmonics - cut comparison ( 00:20 ) 0 filesMarcin Zawisza (WUT)

DB entry changes between 20080412 and 20080418, preparation for Year8 production

Here is the (reshaped) dump of the db differences (image rescaled, view image for details).

Only vertex related.

AOB


Talk time : 01:00, Duration : 00:01

No meeting next week


Talk time : 00:40, Duration : 00:20

IST

Speaker : Gerrit


Talk time : 00:30, Duration : 00:10

Pixel Electrical

Speaker : Leo


Talk time : 00:20, Duration : 00:10

Pixel Mechanical

Speaker : Howard W.


Talk time : 00:10, Duration : 00:20

HFT Meeting at BNL

Speaker : Flemming


Talk time : 00:10, Duration : 00:10