Physics Driving the mid-rapidity tracking upgrades

Speaker : J. Thomas ( LBNL )


Talk time : 09:00, Duration : 00:20

Executive Session

Conclusions, close-out

TimeTalkPresenter
09:00Call Back Presentations ( 01:30 ) 0 filesTBA
10:30Discussion ( 01:30 ) 0 filesTBA
12:00Review final report & recommendations ( 00:10 ) 1 file

Efficiency, simulations, mechanical overview

TimeTalkPresenter
13:45Simulated HPD Performance: hit finding efficiency, resolution, occupancy ( 00:20 ) 1 fileH. Caines (Yale)
14:05Simulated IST Performance: hit finding efficiency, resolution, occupancy ( 00:20 ) 1 fileG. van Nieuwenhuizen (MIT)
14:25Combined HPD/ Silicon Strip efficiency/ghosting/ pointing, resolution/primary vertex resolution ( 00:35 ) 2 filesS. Salur & W. Leight (Yale / MIT)
15:00IST Silicon Strip Cost/Schedule/Resources ( 00:20 ) 1 fileB. Surrow (MIT)
15:20Impact of Upgraded Inner Tracker on STAR's Quarkonia ( 00:20 ) 1 fileT. Ullrich (BNL)
15:40Coffee break ( 00:20 ) 0 files (BNL)
16:00Requirements on Forward Tracking upgrade; simulated e/h separation, e+/e- separation ( 00:40 ) 1 fileB. Surrow (MIT)
16:40Concept for Forward Tracking Configuration ( 00:20 ) 1 fileB. Surrow (MIT)
17:00GEM Technology Development ( 00:20 ) 1 fileF. Simon (MIT)
17:20Mechanical design/Integration ( 00:20 ) 1 fileB. Surrow (MIT)
17:40Discussion of homework ( 00:30 ) 0 filesAll (All)

Physics Goals & project overview

TimeTalkPresenter
08:45Executive Session ( 00:15 ) 0 files
09:00Physics Driving the mid-rapidity tracking upgrades ( 00:20 ) 1 fileJ. Thomas (LBNL)
09:20Physics Driving the Forward tracking upgrades ( 00:20 ) 1 fileE. Sichtermann (LBNL)
09:40Overview of concept for STAR mid-rapidity and forward tracking upgrades ( 00:20 ) 1 fileR. Majka (Yale)
10:00Status of HFT development ( 00:20 ) 2 filesH. Wieman (LBNL)
10:20Status of SSD Operation ( 00:20 ) 1 fileH. Matis (LBNL)
10:40Coffee Break ( 00:20 ) 0 files (LBNL)
11:00Pointing Requirements on the IST for the HFT ( 00:20 ) 1 fileA. Rose (LBNL)
11:20Proposed Hybrid Pixel Detector; sensors, electronics, support, material budget + Cost, schedule, resources ( 00:40 ) 1 fileR. Bellwied (WSU)
12:00Proposed Silicon Strip IST Layers; sensors, electronics, support, material budget ( 00:20 ) 1 fileG. van Nieuwenhuizen (MIT)

Review of STAR Tracking Upgrades

-00-00
-
from Thursday, 1 January 1970 to Thursday, 1 January 1970
Conference duration: 1 day

SPIN 2006 Preliminary Result

AOB

Speaker : All ( All )


Talk time : 12:50, Duration : 00:10

DEV/ ROOT 5 feedback

Speaker : All ( All )


Talk time : 12:40, Duration : 00:10

Qt work in dev, EventDisplay recent developments

Speaker : Valeri Fine ( BNL )


Talk time : 13:10, Duration : 00:10

Run 6, pp 62 GeV calibration

Speaker : Gene Van Buren ( BNL )


Talk time : 12:20, Duration : 00:10

See pp62 (2006) for more information.

Run VII QA preparation

Speaker : Lanny Ray ( UTA )


Talk time : 12:10, Duration : 00:10

Data production overview

Speaker : Lidia Didenko ( BNL )


Talk time : 12:00, Duration : 00:10

Comparison of Electron and MIP Calibrations

Under:
This page compares the new tower calibration performed using only electron E/p to the calibration using last year's algorithm.  The two calibrations are found to be consistent within 120 MeV in E_T.

emc2-hn minutes (by Jan)

Under:
  • xx xx, 200x
    • next,
  • xx xx, 200x
    • next,
  • xx xx, 200x
    • next, I forgot to edit this

 

software

Under:

Endcap Sofware  2006++

 

how-to by Jan

Under:

Instructions

SSH key management, last call for model change

Speaker : Jerome Lauret ( BNL )


Talk time : 14:30, Duration : 00:10

Pending issues, round table

Speaker : All


Talk time : 14:10, Duration : 00:10

The following topics were pending from the previous meeting and needed follow-ups


  1. Tripwire versus AIDE + real evaluation of tripwire impact
  2. Shift signup: provision for more than one Email address per institution

Purchase status

Speaker : All


Talk time : 14:00, Duration : 00:10