STAR HBT phone meeting

-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00

From Skype call +99008275548848

1-605-475-8500 (long distance costs apply).

Calling from Europe, call

In Belgium: 070 35 9987

In France: 0826 100 275

In Germany 01805 00 7646

In Ireland: 0818 270 032

In Italy: 0848 390 172

In Switzerland: 0848 560 152

In UK: 0870 738 0760

(national rate charges will apply).

Enter Conference Room Number : 5548848

TimeTalkPresenter
15:30More 'realistic' studies with GenBod ( 00:10 ) 0 filesZbigniew Chajecki (OSU)

Library and code cleanup plans

Speaker : Jerome Lauret ( BNL )


Talk time : 12:55, Duration : 00:10
Yesterday, a meeting was held with Yuri F. and Victor P. to discuss several important steps needed as per our infrastructure and code cleanup. As a background
  • Since the arrival of the Sti tracker, we folowed a path where two separate code development path, preserving the old code for backward compatibility and comparison pruposes. Sti is now our official tracker. Old code should be retired.
  • The Sti cleanup has stopped due to the onset of new actibvities (SVT/SSD mainly). Several actions items and interface convenience and cleanup were discussed and needed but incomplete. Those include
    • Algorithmic switches explicit based on detector geometry layers(if statements in core codes) rather than externally controllable. This does not allow for flexible framework.

B-EMC calibration update for Run6

Speaker : Adam Kocoloski ( MIT )


Talk time : 12:30, Duration : 00:10
BEMC has two unfinished tasks re: run6 production readiness

BSMD pedestals: tables are ready to upload for transverse running and late longitudinal. 62 GeV tables will be available soon after DAQ files are fully staged.

FTPC calibration readiness

Speaker : Terrence Tarnowsky ( Purdue )


Talk time : 12:20, Duration : 00:10

Calibration progress for Year6

Speaker : Gene Van Buren ( BNL )


Talk time : 12:10, Duration : 00:10

pp2006 Calibrations status

TPC
Four major periods during run:
  1. First 200 GeV longitudinal polarization period
  2. 200 GeV transverse polarization period

Simulation datasets overview and estimates

Speaker : Maxim Potekhin ( BNL )


Talk time : 12:00, Duration : 00:10

Status of PPV vertex finder in 2006

Speaker : Jan Balewski ( IUCF )


Talk time : 12:40, Duration : 00:15

Short overview of PPV algo is in attached .ppt (PPVin60sec)
Summary of PPV evaluation prior to 2006 production is posted at
http://www.star.bnl.gov/protected/spin/balewski/2006-PPV-eval/
For reference the analogous summary for 2005 pp data is avaliable at
http://www.star.bnl.gov/protected/spin/balewski/2005-PPV-vertex/

Online computing run preparation plans

Under:

This page will list by year action items, run plans and opened questions. It will server as a repository for documents serving as basis for drawing the requirements.

Notes

Under:

Overview



The document is intended as a forum for embedding group members to share information and notes.

Quality Control

Under:

  • dEdx Comparisons

  • These are dedx vs P graphs. All of them show reasonable agreement with data.(Done on May 2002)

    Dedx-dedxPiPlus.gif
    Dedx-dedxKMinus.gif

    Old Requests

    Under:

    Overview



    This page is intended to provide details of embedding jobs currently in production.

    Embedding Procedures

    Under:

    Overview



    Embedding Documentation

    Under:

    Overview


    pion-proton SHD

    Speaker : Marcin Zawisza


    Talk time : 15:40, Duration : 00:10

    QM 2006 abstract

    Speaker : Debasish Das ( VECC )


    Talk time : 15:30, Duration : 00:10

    Average dispatch time, all dispatchers, past 3 months (200607)

    Under:
    Average dispatch time,  all dispatchers, past 3 months (200607)

    SUMS and Grid snapshots

    Under:
    On this page, we will save snapshots of how SUMS "sees" the Grid utilization.
    Average dispatch time,  all dispatchers, past 3 months (200607)

    ROOT 5 plans

    Speaker : All ( All )


    Talk time : 12:45, Duration : 00:10

    AOB

    Speaker : All ( All )


    Talk time : 12:55, Duration : 00:05

    p+p Run6 calibrations update

    Speaker : Gene Van Buren ( BNL )


    Talk time : 12:35, Duration : 00:10