Software and Computing

Run 10 production times by dataset

 Following on from A look at production times for AuAu 7 and 39 GeV, which focused on inefficiency of production jobs due to time spent accessing the DB, I tried to assess the computing resources nee

AOB


Talk time : 12:50, Duration : 00:10
  • Catching up on activities planned from You do not have access to view this node:
    • CuCu reproduction status
    • AuAu11 streams production status

Run 10 Calibrations Update

Speaker : G. Webb ( UK )


Talk time : 12:35, Duration : 00:15

TPC:

Limiting production of events with large hit counts

Speaker : G. Van Buren ( BNL )


Talk time : 12:20, Duration : 00:15

 See Limiting production of events with large hit counts

 Also Sequential excessively large TPC events

TOF in PPV

Speaker : R. Reed ( UC Davis )


Talk time : 12:00, Duration : 00:20

 See TOF in PPV

Software and Computing phone meeting

2010-09-01 12:00
2010-09-01 13:00
America/New York
Wednesday, 1 September 2010
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00TOF in PPV ( 00:20 ) 1 fileR. Reed (UC Davis)
12:20Limiting production of events with large hit counts ( 00:15 ) 0 filesG. Van Buren (BNL)
12:35Run 10 Calibrations Update ( 00:15 ) 0 filesG. Webb (UK)
12:50AOB ( 00:10 ) 0 files

Limiting production of events with large hit counts

Introduction

As discussed at the You do not have access to view this node S&C meeting,  Jerome proposed to avoid reconstruction of events which obviously have some excessive amount of

Production status for Run10

Speaker : Gene Van Buren ( BNL )


Talk time : 12:35, Duration : 00:10

Following the Run plan for Year 10 data processing, as You do not have access to view this node. Some further details...

Software and Computing phone meeting

2010-08-25 12:00
2010-08-25 13:00
America/New York
Wednesday, 25 August 2010
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00CA project status and summary ( 00:25 ) 1 fileIgor Kulakov, Maksym Zyzak (GSI)
12:25VMC Geometry status ( 00:10 ) 1 fileJason Webb (BNL)
12:35Production status for Run10 ( 00:10 ) 0 filesGene Van Buren (BNL)
12:45Tracking problem discussion, RT 1989 ( 00:10 ) 0 filesBNL team (BNL)
12:55AOB ( 00:05 ) 0 filesAll (All)

TPC Anode Voltage QA Instructions

Introduction:

Software and Computing phone meeting

2010-08-11 12:00
2010-08-11 12:00
America/New York
Wednesday, 11 August 2010
1-189, EVO, at 16:00 (GMT), duration : 00:00
TimeTalkPresenter
12:00CA project, status report ( 00:15 ) 1 fileIgor Kulakov, Maksym Zyzak (GSI)
12:15Minuit VF performance for 200 GeV Run 10 ( 00:20 ) 1 fileRosi Reed (UC-Davis)
12:35Calibration status for Run 10 production ( 00:15 ) 0 filesGrant Webb (UKY)
12:50Plug & Play event generator, an example ( 00:10 ) 1 fileJonathan Bouchet (KSU)
13:00AOB ( 00:05 ) 0 filesAll (All)

A look at production times for AuAu 7 and 39 GeV

 More on stream production inefficiency effects are in Jerome's Effect of stream data on database performance, a 2010 study. This is just a portion of that examination and work.

-Gene

Effect of stream data on database performance, a 2010 study

Software and Computing phone meeting

2010-07-28 12:00
2010-07-28 13:00
America/New York
Wednesday, 28 July 2010
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00VMC project status ( 00:20 ) 1 fileVictor Perevoztchikov, Jason Webb (BNL)
12:20CA project, integration progress in STAR ( 00:20 ) 1 fileIgor Kulakov, Maksym Zyzak (GSI)
12:40Embedding news and progress ( 00:15 ) 0 filesRenee Fatemi (UKY)
12:55AOB ( 00:05 ) 0 filesAll (All)

AOB

Speaker : all


Talk time : 12:40, Duration : 00:10

 Bugs of the week:

#1970 : STARlite simulations in embedding. Not taken [Yuri?].

Vertex finding for 7 GeV

Speaker : R. Reed ( UC Davis )


Talk time : 12:10, Duration : 00:30

 Presentation is available here.

Production status

Speaker : L. Didenko ( BNL )


Talk time : 12:00, Duration : 00:10

Software and Computing phone meeting

2010-07-14 12:00
America/New York
Wednesday, 14 July 2010
1-189, EVO, at 16:00 (GMT), duration : 00:00
TimeTalkPresenter
12:00Production status ( 00:10 ) 0 filesL. Didenko (BNL)
12:10Vertex finding for 7 GeV ( 00:30 ) 1 fileR. Reed (UC Davis)
12:40AOB ( 00:10 ) 0 filesall

ITD's Catalyst chassis in the DAQ room (subnets 60, 162, wireless and possibly others in 1006)

This switch chassis is in the networking rack in the northwest corner of the DAQ room.  It is managed by ITD.  STAR has no way to interact with this switch at the software/confi

Run plan for Year 10 data processing