Software and Computing

Run 10 preparation meetings #4

2009-11-06 15:00
2009-11-06 17:00
Etc/GMT-5
Friday, 6 November 2009
1-189, EVO, at 20:00 (GMT), duration : 02:00
TimeTalkPresenter
15:00Current Offline and Online QA Frameworks ( 00:20 ) 1 fileG. Van Buren (BNL)

Software and Computing phone meeting

2009-11-04 12:00
2009-11-04 13:00
Etc/GMT-5
Wednesday, 4 November 2009
1-189, EVO, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Code and library cleanup ( 00:20 ) 1 fileYuri Fisyak (BNL)
12:20Vertex finder fixes, PPV ( 00:15 ) 1 fileRosi Reed (UCDavis)
12:35Calibration convergence update for Year 9 ( 00:20 ) 0 filesGene Van Buren (BNL)
12:55AOB ( 00:05 ) 0 filesAll (All)

Problems with applying TPC alignment

I ran a test (in SL09e) where I made the alignment of one sector grossly wrong.

Embedding structure

Organization, responsibilities, authorities and policies related to Embedding

Due to the increasing demand of the STAR collaboration, associated to the need for redundancy

Software and Computing phone meeting

2009-10-28 12:00
2009-10-28 13:00
Etc/GMT-5
Wednesday, 28 October 2009
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Overview of last week's action items ( 00:10 ) 0 filesAll (BNL)
12:10Spin PWG QA ( 00:20 ) 1 fileJim Sowinski (IUCF)
12:30UPC QA of Sti ( 00:20 ) 1 fileYury Gorbunov (Creighton)
12:50Calibration convergence update for Year 9 ( 00:10 ) 1 fileGene Van Buren (BNL)

Run 9 T0 differences between fields

T0-by-padrow calibrations were performed for Run 9 using run 10118050 for RFF and run 10184053 for FF.

Software and Computing phone meeting

2009-10-21 12:00
2009-10-21 13:00
Etc/GMT-5
Wednesday, 21 October 2009
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00dE/dx in TPCX ( 00:20 ) 1 fileYuri Fisyak (BNL)
12:20Calibration status for Run IX ( 00:20 ) 1 fileGene Van Buren (BNL)
12:40AOB ( 00:20 ) 0 filesAll (All)

Locations needing network access

WAH: (starp and DAQ/TRG devices are scattered throughout these locations.  I am going to use the term “satellite racks” to include all locations within the C-AD PASS system

Reshape design goals

A.  Only use managed switches and have each networked device plug directly into a managed switch port.
   

Run 9 TPC alignment artifacts

In trying to help Grant and Na complete the TPC alignment work for Run 9, I've observed some troublesome artifacts in the along-the-padrow residuals.

Preliminary examination of -/+ in st_W production

 I grabbed the files of electron candidate tracks from Matt Walker which he used for his 10 Electron E/p from pp500 L2W events from the st_W sample production,

Transfer BNL/PDSF, summer 2009

This page will document the data transfers from/to PDSF to/from BNL in the summer/autumn of 2009.

October 17, 2009

Run 9 TPC field cage currents

Run 9 saw a continuation of the partial resistor short on OFC west which was seen in previous years, plus a new "full" resistor short on OFC west.

Sector 5 gains over the years

In the context of the Sector 5 anomaly, here are the gains for Sector 5 plotted by padrow vs. pad, and mean values per padrow (using only those pads with gains within +/-0.8 of 1.0).

Software and Computing phone meeting

2009-09-09 12:00
2009-09-09 13:00
Etc/GMT-5
Wednesday, 9 September 2009
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Run 9 TPC Padrow-by-padrow T0 calibration ( 00:20 ) 0 filesGrant Webb (UKY)
12:20Run9 slewing effects in the TPC ( 00:20 ) 0 filesGene Van Buren (BNL)
12:40Evidence supporting prompt TPC hits ( 00:10 ) 0 filesGene Van Buren (BNL)
12:50AOB ( 00:10 ) 0 filesAll (All)

New table for TPC slewing

Based on recent work I've done regarding First look at TPC slewing in Run 9 data, and presented at

What should be the default access for blogs?

public
33% (12 votes)
protected
67% (24 votes)
No opinion
0% (0 votes)
Total votes: 36

First look at TPC slewing

 Calibrating padrow-by-padrow T0s showed evidence of dependence of T0s on anode HV: the padrows under anode section 7-6 (padrows 22-29) showed a shift of 15-20 ns for a reduction in voltage fr

Distortion effects on padrow shape

 Applying the following distortions:

Software and Computing phone meeting

2009-09-02 12:00
2009-09-02 13:00
Etc/GMT-5
Wednesday, 2 September 2009
1-189, EVO, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Calibration progress and overview for Run 9 ( 00:20 ) 1 fileGene Van Buren (BNL)
12:20Embedding progress overview, opened problems ( 00:20 ) 1 fileRenee Fatemi (UKY)
12:40Preview efficiencies from pre-production SL09b/W ( 00:10 ) 1 fileJan Balewski (MIT)
12:50AOB ( 00:10 ) 0 filesAll (All)