STAR Protected

Documentation- storage and control


Talk time : 14:00, Duration : 00:30

 Adept, web server, control documents

Overflow if need be


Talk time : 10:30, Duration : 00:30

HFT management


Talk time : 09:00, Duration : 01:30

HFT bi-monthly- day 2

2010-03-11
America/New York
Thursday, 11 March 2010
2-84 BNL, at 14:00 (GMT), duration : 00:00
TimeTalkPresenter
09:00HFT management ( 01:30 ) 1 file
10:30Overflow if need be ( 00:30 ) 2 files
11:00Integration - interface specifications ( 01:00 ) 4 files
13:30Grounding plans ( 00:30 ) 0 files
14:00Documentation- storage and control ( 00:30 ) 4 files
14:30preparation for TDR, WBS and near term plans ( 00:30 ) 0 files

CD-1 response and Software plans

Speaker : S.Margetis


Talk time : 16:20, Duration : 00:40

HFT-FGT integration issues

Speaker : J.Bessuille


Talk time : 15:50, Duration : 00:30

D.Beavis

Speaker : Beampipe - Safety ( BNL )


Talk time : 15:20, Duration : 00:30

BREAK


Talk time : 15:00, Duration : 00:20

IDS and integration

Speaker : E.Anderssen ( LBNL )


Talk time : 14:30, Duration : 00:30

SSD upgrade

Speaker : M.LeVine ( BNL )


Talk time : 13:45, Duration : 00:45

LUNCH


Talk time : 12:15, Duration : 01:30

IST status

Speaker : Gerrit J. van Nieuwenhuizen II ( MIT )


Talk time : 11:30, Duration : 00:45

PXL mechanical

Speaker : H.Wieman ( LBNL )


Talk time : 10:50, Duration : 00:40

BREAK


Talk time : 10:30, Duration : 00:20

PXL electronics

Speaker : L.Greiner


Talk time : 09:45, Duration : 00:45

Welcome & project Overview

Speaker : F.Videbaek ( BNL )


Talk time : 09:15, Duration : 00:30

 Project status

- CD1 questions

- Preparations for CD2/3

 

RHICBOS / deFlorian Calculations - Input for Projections

1) RHICBOS calculations are located here:

- Readme file

- Location

2) deFlorian calculations are located here: 

Correlation between ToT and HV currents

Hi All,

HOWTO: Set random number seeds in starsim

The short answer:
seed1 = 123
seed2 = 456

RNDM [seed1] [seed2]

 

Integrated luminosity using the coincidence BHT3

Below is the integrated luminosity for the BHT3 trigger as calculated using the BHT3~coincidence trigger (requiring away sum ADC>97).