STAR Protected
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
1) News: WAH;
2) Whitepapers: DNP-Jamie // RHIC Spin: Carl
3) QM12 proceedings QA: Xin
4) Upgrade review: Flemming
5) FGT issues: Jerome
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February 25 - March 1, 2013
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
1) News: (1) WAH; (2) DNP Town meetings
2) FGT issues: Nu
3) Upgrade projects and IP2: Flemming
4) TBD
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:
III. Note:
► RHIC WhitePaper: The Case for Continuing RHIC Operations 9/2/2012
► DNP HI WhitePaper: Hot and Dense QCD Matter
► RHIC Spin WhitePaper: The RHIC Spin Program
► EIC WhitePaper: Electron Ion Collider: The Next QCD Frontier
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February 25 - March 1, 2013
J/psi production in the STAR experiment
Updated on Tue, 2012-11-06 08:26 by trzeciak. Originally created by lkosarz on 2012-10-18 17:12.
Reference
Speaker : Barbara Trzeciak ( WUT )
Talk time : 11:20, Duration : 00:20
STAR Regional Meeting: Heavy Quark Production and Correlations 2012
Updated on Thu, 2012-11-01 08:52. Originally created by lkosarz on 2012-10-18 16:20.Faculty of Physics, Warsaw University of Technology, Warsaw
- Jaroslav Bielcik (CTU)
- Martin Girard (WUT)
- Adam Kisiel (WUT)
- Leszek Kosarzewski (WUT)
- Grazyna Odyniec (LBNL)
- Piotr Ostrowski (WUT)
- Tomasz Pawlak (WUT)
- Jan Pluta (WUT)
- Michal Sumbera (NPI)
- Barbara Trzeciak (WUT)
- Hanna Zbroszczyk (WUT) - Chairperson
STAR Regional Meeting: Heavy Quark Production and Correlations 2012 takes place at Faculty of Physics of Warsaw University of Technology
DNP2012-draft2
Reference
Talk time : 09:00, Duration : 00:20
How useful do you think EVO is for our community and Video Tele Conferencing?
HFT PXL geomrtry
, at 15:00 (GMT), duration : 00:00
Discussion on parts needed in Agml for PXL Y2013
Time | Talk | Presenter |
---|---|---|
11:00 | PixlGeo4 missing parts update ( 00:20 ) 1 file | Amilkar Quintero |
DNP2012_firstdraft
Reference
Talk time : 09:00, Duration : 00:20
http://drupal.star.bnl.gov/STAR/event/2012/07/11/pp2pp-analysis/update-analysis-updated-after-talk-july-18-2012
STAR Inner Detector Support pictures Sept 2012
A couple of pictures by BNL photography after IDS was lifted to platform.
FGT Event Display screenshots
Status Update: The FGT geometry and pedistal values are now being read from the common database. Everything still works just fine.
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Weekly Meeting // Community: STAR // Password: star
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
1) News: (a) Tribble subcommittee meeting: Nu [Talks: Bill Zajc, Steve Vigdor1, Urs Wiedemann, Steve Vigdor2]
2) STAR whitepaper-II: Bedanga
3) QM QA and Proceedings: Xin
4) Rotatiion Spin PWG co-convener: Nu (2 candidates)
5) Next collaboration meeting: Feb. 11-15?
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:Bedanga, Flemming, Scott, Xin, Carl, Huan, Jerome, Nu
2) Tribble subcommittee discussion:
3) ReviewPaper (WhitePaper): Bedanga: more report next week. New W-analysis show good progress. Inclusive and di-jets results are consist
4) QM proceedings QA: Xin. Discussions among co-conveners and PAC. Results on UU, HBT, Fluctuation (DCC search): QA in health progress,
value is between (0.99, 1), systematic error is important, both East and West FTPCs should be checked; need more people on HBT related analysis.
5) Meeting dates: It was Feb. 24-March 1, 2013. Gary requested the change. // No meeting next week.
6) Trigger Board: one candidatenow. We are also starting preparation for Run13. Will be discuss on the Sept. 24 meeting.
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► SPIN2012, Dubna, Russia, September 17-22, 2012
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February, 2013
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Weekly Meeting // Community: STAR // Password: star
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
iTPC DIscussions:
Note from Jim/Zhangbu:
1.) Organize the project, recover lost & retired skills. Review available drawings and documentation. Arrange for best available manpower
and write contracts with institutions. 6 FTE months.
2.) Mechanical design: a.) Strongback - 6 FTE months b.) Pad Plane (mechanical) - 3 FTE months
c.) Grids and Wire Factory design and layout - 6 FTE months
These activities can be done in series or in parallel, depending on available human resources.
3.) Electrical design: a.) Pad Plane (electrical) - 3 FTE months b.) FEE - 6 FTE months (need input from Tonko, ignores problem with sAltro)
c.) RDO - 6 FTE months (need input from Tonko, ignores problem with sAltro)
These activities can be done in series or in parallel, depending on available human resources.
4.) Cooling - 3 FTE months
5.) Mechanical Fabrication a.) Strongback - 3 months duration at outside shop plus time to write and sign contract. Guesstimate 15K per sector.
b.) Grids - 1 year duration. Need to build small factory. 3 Techs fulltime.
6.) Electrical Fabrication a.) Pad plane - 3 months duration at outside shop plus time to write and sign contract. Guesstimate 5K per sector.
b.) FEE - less than 1 year duration. Guesstimate 750K for all Fee's.
c.) RDO - less than 1 year duration. Guesstimate 500k for all RDO's.
7.) Installation a.) Mechanical - 3 months duration. 3 techs full time. b.) Electrical - 3 months duration. 3 techs full time.
This plan assumes that the Sector Installation tool will be paid for by STAR operations. Further, it is assumed that the Sector Installation tool
design will be completed in the summer of 2013; fabricated and safety approved and tested before the summer of 2014. Finally one or more
sectors must be installed and tested with the new sector installation tool before we install the full iTPC upgrade. So if the tool is ready for use in
the summer of 2014, we install one sector (sector 20?) and test it in the subsequent run. Assuming success, this means the iTPC upgrade can
be installed in the summer of 2015 (for run 16).
So with a dedicated and efficient team, the iTPC upgrade can be completed in a duration of 3 years ... but this is fairly fast paced and it assumes
that the very best people are ready and available to work on the project.
45% contingency is about the maximum that Physicists will allow and the minimum that the DOE will accept for a project at this stage of development ;-)
Grand Total: 2 Million labor + 1.75 Million Fabrications + 45% = $5.4M
Duration: 3 years
*--===================================================================--*
II. Brief Summary and action Items:
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► SPIN2012, Dubna, Russia, September 17-22, 2012
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February 25 - March 1, 2013
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Weekly Meeting // Community: STAR // Password: star
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
1) News: () Fix-target; NU (a) Next collaboration meeting date; (b) Trigger board chair: Nu
2) STAR whitepaper-II: Bedanga
3) QM12 proceedings QA: Xin
4) Upgrade projects (HLT/iTPC/FCal/pp2pp-IIa): Flemming/Huan
5) Spin co-convener: Nu
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:Jamie, Gene, Jerome, Flemming, Xin, Carl, Huan, Bedanga, Nu, Scott,
2) Spin Contribution to Tribble Committee: STAR results on (a) Run9 di-jets; (b) Ws from Run12; Spin PWG signed off for QCDn and DNP; (c)
3) Upgrades: Flemming&Huang will setup a meeting in Oct. to discuss upgrades. In the mean time, we request CAD to make the estimate for pp2pp IIa.
4) FGT installation:
5) HFT: LBNL takes over SSD electronics, intention to early coopletion. DIscussed with DOE, no strong disagreement. More review may be needed. LBNL is ready for
pixel production for Run13. End January sectors will be ready. Platform insertation test, Oct. 20-30.
6) Fixed-target: include SOP in the discussions.
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February 25 - March 1, 2013
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Weekly Meeting // Community: STAR // Password: star
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
1) News: (a) WAH; (b) Run12 W-plot
2) QM12 proceedings QA: Xin
3) Update on FGT/HFT/ Upgrade review: Flemming
4) Spin co-convener: Nu
5) TBD
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance: Carl, Xin, Bedanga, Huan, Nu, Jamie, Flemming, Jerome, Gene.
2) Run12 W-plot: It is ready for public. Will appear in DNP talks by Renee, Jan, Elke, Carl. Jamie will contact BNL // MTD installation started at the WAH
3) QM proceedings: Till yesterday we have 19 out of 20 parallel QM drafts. The missing PA is remined. / UU results have been rechecked. / Invited
4) Upgrade: Flemming. (a) FGT almost all 4 Quadrants By Nov. 6th. No news on the cosmic ray tests. S. Steadmann presented a plan, budget/progress are
on track. Needs more effort on software. (b) HFT: next Tuesday review. LBNL will take care of the electronics and production. DOE NP has been informed.
Tom wants a technical review of the HFT project, sometime next January. BNL led review. (c) R&D meeting: Hank's/iTPC/HLT/FCal, Xin/Wei/Dick/..
no guidence from BNL yet.
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February 25 - March 1, 2013
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00