STAR Protected
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Weekly Meeting // Community: STAR // Password: star
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
1) News: (a) Tribble subcommittee meeting: Nu [Talks: Bill Zajc, Steve Vigdor1, Urs Wiedemann, Steve Vigdor2]
2) STAR whitepaper-II: Bedanga
3) QM QA and Proceedings: Xin
4) Rotatiion Spin PWG co-convener: Nu (2 candidates)
5) Next collaboration meeting: Feb. 11-15?
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:Bedanga, Flemming, Scott, Xin, Carl, Huan, Jerome, Nu
2) Tribble subcommittee discussion:
3) ReviewPaper (WhitePaper): Bedanga: more report next week. New W-analysis show good progress. Inclusive and di-jets results are consist
4) QM proceedings QA: Xin. Discussions among co-conveners and PAC. Results on UU, HBT, Fluctuation (DCC search): QA in health progress,
value is between (0.99, 1), systematic error is important, both East and West FTPCs should be checked; need more people on HBT related analysis.
5) Meeting dates: It was Feb. 24-March 1, 2013. Gary requested the change. // No meeting next week.
6) Trigger Board: one candidatenow. We are also starting preparation for Run13. Will be discuss on the Sept. 24 meeting.
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► SPIN2012, Dubna, Russia, September 17-22, 2012
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February, 2013
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Weekly Meeting // Community: STAR // Password: star
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
iTPC DIscussions:
Note from Jim/Zhangbu:
1.) Organize the project, recover lost & retired skills. Review available drawings and documentation. Arrange for best available manpower
and write contracts with institutions. 6 FTE months.
2.) Mechanical design: a.) Strongback - 6 FTE months b.) Pad Plane (mechanical) - 3 FTE months
c.) Grids and Wire Factory design and layout - 6 FTE months
These activities can be done in series or in parallel, depending on available human resources.
3.) Electrical design: a.) Pad Plane (electrical) - 3 FTE months b.) FEE - 6 FTE months (need input from Tonko, ignores problem with sAltro)
c.) RDO - 6 FTE months (need input from Tonko, ignores problem with sAltro)
These activities can be done in series or in parallel, depending on available human resources.
4.) Cooling - 3 FTE months
5.) Mechanical Fabrication a.) Strongback - 3 months duration at outside shop plus time to write and sign contract. Guesstimate 15K per sector.
b.) Grids - 1 year duration. Need to build small factory. 3 Techs fulltime.
6.) Electrical Fabrication a.) Pad plane - 3 months duration at outside shop plus time to write and sign contract. Guesstimate 5K per sector.
b.) FEE - less than 1 year duration. Guesstimate 750K for all Fee's.
c.) RDO - less than 1 year duration. Guesstimate 500k for all RDO's.
7.) Installation a.) Mechanical - 3 months duration. 3 techs full time. b.) Electrical - 3 months duration. 3 techs full time.
This plan assumes that the Sector Installation tool will be paid for by STAR operations. Further, it is assumed that the Sector Installation tool
design will be completed in the summer of 2013; fabricated and safety approved and tested before the summer of 2014. Finally one or more
sectors must be installed and tested with the new sector installation tool before we install the full iTPC upgrade. So if the tool is ready for use in
the summer of 2014, we install one sector (sector 20?) and test it in the subsequent run. Assuming success, this means the iTPC upgrade can
be installed in the summer of 2015 (for run 16).
So with a dedicated and efficient team, the iTPC upgrade can be completed in a duration of 3 years ... but this is fairly fast paced and it assumes
that the very best people are ready and available to work on the project.
45% contingency is about the maximum that Physicists will allow and the minimum that the DOE will accept for a project at this stage of development ;-)
Grand Total: 2 Million labor + 1.75 Million Fabrications + 45% = $5.4M
Duration: 3 years
*--===================================================================--*
II. Brief Summary and action Items:
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► SPIN2012, Dubna, Russia, September 17-22, 2012
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February 25 - March 1, 2013
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Weekly Meeting // Community: STAR // Password: star
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
1) News: () Fix-target; NU (a) Next collaboration meeting date; (b) Trigger board chair: Nu
2) STAR whitepaper-II: Bedanga
3) QM12 proceedings QA: Xin
4) Upgrade projects (HLT/iTPC/FCal/pp2pp-IIa): Flemming/Huan
5) Spin co-convener: Nu
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:Jamie, Gene, Jerome, Flemming, Xin, Carl, Huan, Bedanga, Nu, Scott,
2) Spin Contribution to Tribble Committee: STAR results on (a) Run9 di-jets; (b) Ws from Run12; Spin PWG signed off for QCDn and DNP; (c)
3) Upgrades: Flemming&Huang will setup a meeting in Oct. to discuss upgrades. In the mean time, we request CAD to make the estimate for pp2pp IIa.
4) FGT installation:
5) HFT: LBNL takes over SSD electronics, intention to early coopletion. DIscussed with DOE, no strong disagreement. More review may be needed. LBNL is ready for
pixel production for Run13. End January sectors will be ready. Platform insertation test, Oct. 20-30.
6) Fixed-target: include SOP in the discussions.
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February 25 - March 1, 2013
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Weekly Meeting // Community: STAR // Password: star
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
1) News: (a) WAH; (b) Run12 W-plot
2) QM12 proceedings QA: Xin
3) Update on FGT/HFT/ Upgrade review: Flemming
4) Spin co-convener: Nu
5) TBD
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance: Carl, Xin, Bedanga, Huan, Nu, Jamie, Flemming, Jerome, Gene.
2) Run12 W-plot: It is ready for public. Will appear in DNP talks by Renee, Jan, Elke, Carl. Jamie will contact BNL // MTD installation started at the WAH
3) QM proceedings: Till yesterday we have 19 out of 20 parallel QM drafts. The missing PA is remined. / UU results have been rechecked. / Invited
4) Upgrade: Flemming. (a) FGT almost all 4 Quadrants By Nov. 6th. No news on the cosmic ray tests. S. Steadmann presented a plan, budget/progress are
on track. Needs more effort on software. (b) HFT: next Tuesday review. LBNL will take care of the electronics and production. DOE NP has been informed.
Tom wants a technical review of the HFT project, sometime next January. BNL led review. (c) R&D meeting: Hank's/iTPC/HLT/FCal, Xin/Wei/Dick/..
no guidence from BNL yet.
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February 25 - March 1, 2013
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
STAR Management Weekly Meeting
BNL, Buld 510, I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Weekly Meeting // Community: STAR // Password: star
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9atauIiaiIt
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 143875 // Password: 0952
Time: 12 - 13 EDT
*--===================================================================--*
I. Agenda:
1) News
2) iTPC plans: Zhangbu / Jim
3) STAR whitepaper-II: Bedanga
4) QM QA and Proceedings: Xin
5) TBD
*--===================================================================--*
II. Brief Summary and action Items:
1) Attandance:
III. Note:
► 2012 RHIC/AGS Thesis Award: Congratulations to Len Eun, full citation.
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► SPIN2012, Dubna, Russia, September 17-22, 2012
► QCD Phase Structure I, Wuhan, October 7-20, 2012
► STAR Regional Meeting, Warsaw, Poland, November 5-7, 2012
► STAR Analysis and Upgrade Meeting, UCLA, November 28 - December 2, 2012
► STAR Collaboration Meeting, BNL, February, 2013
pp2pp weekly
Physics 1-189, at 14:00 (GMT), duration : 02:00
pp2pp weekly
Physics 1-189, at 14:00 (GMT), duration : 02:00
pp2pp weekly
Physics 1-189, at 14:00 (GMT), duration : 02:00
http://drupal.star.bnl.gov/STAR/event/2013/03/20/pp2pp-weekly
2. Other... let me know
Description:
Community: STAR
Password: elasticpp
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9ataDI8aiIt
- Password: elasticpp
- Phone Bridge
ID: 14 3369
Password: 5158
- USA (BNL, Upton, NY)
+1 631 344 6100
- Skype (tm) (World-wide)
evo.phone
See: http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
Time | Talk | Presenter |
---|---|---|
10:00 | Ivan's Update ( 00:20 ) 1 file | Ivan Koralt |
10:00 | Time-of-flight corrections on pp2pp 2009 data ( 00:20 ) 1 file | Rafal Sikora (AGH UST) |
pp2pp weekly
Physics 1-189, at 14:00 (GMT), duration : 02:00
pp2pp weekly
Physics 1-189, at 14:00 (GMT), duration : 02:00
pp2pp weekly
Physics 1-189, at 14:00 (GMT), duration : 02:00
- Alignment and t-scale - Ivan
- Update on CEP in 2009 run - Leszek
- UPC trigger in Run 13 - Ramiro, Leszek, all
Description:
Community: STAR
Password: elasticpp
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9ataDI8aiIt
- Password: elasticpp
- Phone Bridge
ID: 14 3369
Password: 5158
- USA (BNL, Upton, NY)
+1 631 344 6100
- Skype (tm) (World-wide)
evo.phone
See: http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
Time | Talk | Presenter |
---|---|---|
10:00 | Alignment and t-scale ( 00:20 ) 1 file | Ivan Koralt (ODU) |
10:20 | Rapidity gap trigger tests ( 00:20 ) 1 file | R. Debbe |
10:20 | Central Production from 2009 data ( 00:20 ) 1 file | Leszek Adamczyk |
pp2pp weekly
Physics 1-189, at 15:00 (GMT), duration : 02:00
http://drupal.star.bnl.gov/STAR/event/2013/02/20/pp2pp-weekly
1. Simulation of pi+pi- invariant mass spectrum for 2009 run - Radek
2. Plan for Central Production paper from 2009 data - Leszek
3. GEANT4 simulations of the beam line - Lukasz
4. UPC trigger for pp run - JH, Leszek, Elke?
5. Discussion of the future, physics program that we want to present to STAR and preparation for collab meeting - Wlodek
6. Other - let me know
Description:
Community: STAR
Password: elasticpp
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9ataDI8aiIt
- Password: elasticpp
- Phone Bridge
ID: 14 3369
Password: 5158
- USA (BNL, Upton, NY)
+1 631 344 6100
- Skype (tm) (World-wide)
evo.phone
See: http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
Time | Talk | Presenter |
---|---|---|
10:00 | Simulation of pi+pi- invariant mass spectrum for 2009 run ( 00:20 ) 1 file | Radek Kycia |
10:20 | Central Production from 2009 data ( 00:15 ) 1 file | Leszek Adamczyk |
10:35 | GEANT4 simulations of the beam line ( 00:25 ) 1 file | Lukasz Fulek |
11:00 | Future and Collab mtg ( 00:20 ) 1 file | Wlodek Guryn |
11:20 | Rapidity Gap Trigger (slides shown at the trigger board meeting 12/17/2012) ( 00:00 ) 1 file | JHL |
pp2pp weekly
Physics 1-189, at 14:00 (GMT), duration : 02:00
pp2pp weekly
Physics 1-189, at 15:00 (GMT), duration : 02:00
http://drupal.star.bnl.gov/STAR/event/2012/12/19/pp2pp-weekly
1. Status and plan from Cracow:
a) Elastic event analysis - Bogdan
b) Luminosity normalization - Janusz
2. The path forward, mainly how to determine the inefficiencies due to instrumental effects - All
3. Are we ready for a paper proposal on A_NN, A_SS? I think yes as it does not require a paper draft - Igor, Dima
4. Run 2013 installation - Wlodek + all
Description:
Community: STAR
Password: elasticpp
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9ataDI8aiIt
- Password: elasticpp
- Phone Bridge
ID: 14 3369
Password: 5158
- USA (BNL, Upton, NY)
+1 631 344 6100
- Skype (tm) (World-wide)
evo.phone
See: http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
Time | Talk | Presenter |
---|---|---|
10:00 | End Game ( 00:20 ) 1 file | Wlodek |
10:05 | Some remarks on lumi ( 00:15 ) 1 file | Janusz Chwastowski |
10:40 | PMT inefficiency in 2009 ( 00:10 ) 1 file | Leszek Adamczyk |
10:50 | Some remarks on lumi ( 00:15 ) 1 file | Janusz Chwastowski |
pp2pp weekly
Physics 1-189, at 15:00 (GMT), duration : 02:00
http://drupal.star.bnl.gov/STAR/event/2013/01/16/pp2pp-weekly
1. Elastic event analysis - Bogdan
2. Luminosity normalization - Questions from Janusz
3. Are we ready for a paper proposal on A_NN, A_SS? I think yes as it does not require a paper draft - Igor, Dima
4. Run 2013 installation - Wlodek + all
Description:
Community: STAR
Password: elasticpp
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBv9ataDI8aiIt
- Password: elasticpp
- Phone Bridge
ID: 14 3369
Password: 5158
- USA (BNL, Upton, NY)
+1 631 344 6100
- Skype (tm) (World-wide)
evo.phone
See: http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
Time | Talk | Presenter |
---|---|---|
10:00 | Run 13 preparation ( 00:20 ) 1 file | Wlodek |
10:20 | Ivan's update ( 00:20 ) 1 file | |
10:40 | About Luminosity ( 00:20 ) 1 file | Angelika Drees |
pp2pp weekly
Physics 1-189, at 14:00 (GMT), duration : 02:00
pp2pp weekly
Physics 1-189, at 14:00 (GMT), duration : 02:00