STAR Protected
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
Title: pp2pp analysis
Description:
Community: STAR
Password: WeeklyElastic
- Phone Bridge
ID: 8 3993
Password: 9771
Agenda:
1. Results with new transport - Kin
2. Discussion - all
Time | Talk | Presenter |
---|---|---|
14:00 | Results from the new transport matrices ( 00:20 ) 1 file | Kin Yip |
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
Title: pp2pp analysis
Agenda: Systematic errors in 2003 and 2002 data - Stephen
Description:
Community: STAR
Password: WeeklyElastic
- Phone Bridge
ID: 8 3993
Password: 9771
pp2pp weekly
Physics 3-192, at 19:00 (GMT), duration : 01:30
Description:
Community: STAR
Password: WeeklyElastic
- Phone Bridge
ID: 8 3993
Password: 9771
Agenda:
1. Magnet information for Run 9- Steve
2. Trigger counter effciency - Kin
3. Systematic errors Run 2002/2003 - Stephen (to be confirmed)
4. The path forward - all
Time | Talk | Presenter |
---|---|---|
14:00 | BPM Trim Run 9 ( 00:30 ) 1 file | Phil Pile |
14:30 | SUMS and triggers ( 00:20 ) 1 file | Kin Yip |
pp2pp weekly
Physics 1-189, at 18:00 (GMT), duration : 01:30
Run 11 preparation meeting #8
1-189, EVO, at 19:00 (GMT), duration : 01:00
Minutes
Attendees: Wayne B., Leve H., Jérôme L., Gene V.B.
ShiftLog [Leve]:
- New server:
- Ready:
- App copied to new server (Wayne)
- Successfully passed stability tests (pounding on it)
- All WARs deployed
- Scripts ready to flush cache and re-copy WARs
- App copied to new server (Wayne)
- To do:
- Will re-check links to and from RunLog
- Watcher script not on yet
- Verify Offline QA Shift Report connections
- Ready:
Online infrastructure [Wayne]:
- New web server:
- Links on homepage checked
- Some issues with DB access and privilege from current node name (dean2)
- New jpgraph version installed in same location as the old one
- Disk exports are not in place, so content isn't being updated currently
- Will do another sync over the weekend or early next week, in addition to the final one when we swap servers
- Ganglia to be installed
- User accounts to be added
- Links on homepage checked
- New web server backup:
- Configuration kept the same as main new web server
- ...but content isn't sync-ed
- Password rotation completed
- mysql-devel installed on online linux nodes (RT 2068)
- Two online disk failures (on onl09 (non-critical) RT 2065 and on onlldap (critical) RT 2067)
- RAID still providing for the file systems in the interim
- ITD network backups failing (RT 2069), but resolution from ITD may have just come through
- Machine replacements:
- emcsc ready (needs either deployed by tomorrow or ITD block needs postponed)
- emcspin ready (Monday)
- starutilities awaiting C-AD software
FastOffline [Jerome]:
- Many files coming into the system, but all are tests, pulsers, etc., so not being processed
- Some missing detector setup, beam energy, etc. information: could mean misconfiguration, or potentially not properly propagated data
QA [Gene]:
- OnlinePlots switched back to newer EVP server
- Switching steps still undocumented
- Pre-combining of FastOffline files still needs tested and configured to be the default
Run 11 preparation meeting #6
1-189, EVO, at 19:00 (GMT), duration : 01:00
Minutes
Attendees: Kefeng, Wayne B., Leve H., Gene V.B., Dmitry A.
ShiftLog [Leve]:
- Manual changes have been reviewed (by Jerome) and committed
- Re-deployed
Databases [Dmitry]:
- cdev enabled (by C-AD), so parameter propagation has begun
- Some data is still empty (e.g. beam species) and may not be filled for several weeks (when beams actually start)
- Might be possible to enter some default values for now
- Numbers are meaningless, so not useful for FastOffline testing
- Some data is still empty (e.g. beam species) and may not be filled for several weeks (when beams actually start)
- Testing new hardware nodes now (2 are available)
- Configuration of new nodes in discussion
Online Infrastructure [Wayne]:
- STAR login environment needs to be able to handle SL5.5 (which was installed on some nodes)
- Will follow up with Jerome
- Online linux pool is losing roughly 1 node a day (rebooting)
- Hit a few with network scans, but response was OK, so no clues
- Spin request (for Pibero):
- User has access to the nodes and is waiting for directory structures and mount points
- Expect to complete within a few days
- User has access to the nodes and is waiting for directory structures and mount points
- Condor installation on for rterm-like access to online pool from gateway
- Installed on the gateway
- Components for the pool nodes is to be done
- Slowness on evp
- Only occurred yesterday (Dec. 16)
- Nothing obvious, but suspicious of AFS, and coincided with mock data transfer challenge from counting house to HPSS
- Paths forward discussed:
- Remove outside AFS dependence using an online repository
- Remove AFS dependence using local codes on evp
- Write a new tool better identify AFS issues (i.e. more proactive than 'fs checkservers')
- Problem doesn't seem to persist, not a priority for now (no action)
- Yury G. requested networking support for the east FPD/FMS rack
- Just extends the starp network geographically
- Needs to be a fiber connection for proper grounding
- Webserver replacement
- Two redhat 5 machines given the ITD thumbs up
- Shared filespaces in progress
- No services started yet
- Request for an account to test tomcat (Leve)
QA [Gene]:
- Demo of the Offline QA with reference histogram comparison
- Missing some features for flexibly defining reference histogram sets (will work on over the holidays)
- Minor suggestion made for improving the "waiting..." display
Run 11 preparation meeting #7
1-189, EVO, at 19:00 (GMT), duration : 01:00
Minutes
Attendees: Leve H., Dmitry A., Jerome L., Wayne B., Gene V.B.
Databases [Dmitry]:
- All DB collectors running now
- Only TPC voltages absent due to no data yet
- Slow Controls Archiver not yet running to avoid collecting value-less data
- With Run start imminent, this needs to get going
- Dmitry will follow up with Yury G.
- Potential to benefit from an unused EPICS feature to read multiple channels in one request (we have been reading one channel at a time across the board), which could cut down the overhead in obtaining data
- Unknown why this wasn't previously used, so testing with caution to learn (perhaps the multiple channel data comes in a burst which could fail for some reason)
- New shift sign-up release is imminent (possibly today)
- Only minor features getting final adjustments (features have been [node:19902 "previously presented"])
- RunLog working fine: new runs appearing, but all being marked bad
- Jerome notes that bad runs won't come through FastOffline, which has been turned on already
- New DB nodes
- Tested and ready for use
- New configuration (relevant for FastOffline use) not yet in place (Jerome and Dmitry will work this out)
- Online DB plots working and logs show usage
- Only unavailable quantities are those collected from the Slow Controls Archiver
ShiftLog [Leve]:
- New manual is printed out and in place at the counting house
- ShiftLeader desktop computer has all the necessary icons, correctly linked and tested, including making a ShiftLog entry
- New web server not critical (stable operation on old web server)
Online infrastructure [Wayne & Jerome]:
- OS upgrade
- One critical: a replacement node for usage in monitoring chilled water (old machine is Windows 2000) is awaiting ITD processing.
- Follow-up with ITD on Monday if nothing transpires by then
- Other machines in the queue ("bond", "beatrice", "l3disp")
- One critical: a replacement node for usage in monitoring chilled water (old machine is Windows 2000) is awaiting ITD processing.
- Online web server replacement
- Currently replicating old machine on new one: file copying and version checking
- ShiftLog request to continue with same Tomcat version (a known quantity) instead of upgrading in hopes of improved stability
- Spin resource request involves storage to be delivered on new server
- Currently replicating old machine on new one: file copying and version checking
- Uncertainty in status of UPS services for computers at the experiment
- Testing today before the Run starts
- Network request for east FMS/FPD racks completed
- Online linux pool has been stable for the past ~3 weeks (after a couple weeks of apparently random reboots)
FastOffline [Jerome]:
- Ready, running, and waiting for data
QA [Gene]:
- OnlinePlots still running on older evp machine (but stable)
- Will look into moving it back over to the new node
- Need Jeff L. to flip some switches (and document it)
- Offline QA
- Finished implementing tools to update just specific histograms in reference set
- QA Shift set of histograms will be flushed next week and started anew
- Histograms only go into the set if given a description, and only stay in the set if a reference is set
We are expecting some collider operations imminently, so data will likely flow through the entire system over the next week.
STAR Management Meeting
BNL, 50-I-189, at 14:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 82633 // Password: 0952
Time: 9 - 10 AM EST
*--===================================================================--*
I. Agenda:
1) Run11 Status and ANDY issue - Bill / All
2) STAR R&D meeting preparation - Flemming
3) QM11 preparation - Bedanga
4) Run11 and BES issues - Nu
5) TBD
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency: Helen, Olga, Nu, Jamie, Jerome, Bedanga,
1) ANDY: CAD claimed that ANDY was not the source of the problem for beam loss. We should continue watching the effects.
2) Run11 and BES: Nu- 18-27-11.5 GeV Au+Au // v2 of phi and anti-p becomes significantly smaller compare to L
and p. // Bedanga: PWGc supports 18-27 GeV Au+Au collisions and may be some energy between 39-62.4 GeV. //
3) QM2011 issues: Bedanga: abstracts are coming // Analysis meeting: senior readers for STAR abstracts before submitting.
4) Jerome: revised plan of data sets for Run11-12-13. // PWG volunteers for QA // W production from Cloud.
III. Note:
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Analysis Meeting, BNL, March 14 - 18, 2011. Chair: Jamie Dunlop.
► DIS2011, Newport News, April 11 - 15, 2011.
► APS Spring Meeting, Anaheim, April 30 - May 3, 2011. Deadline for abstract submission: January 14th, 2011.
► STAR Collaboration Meeting, Prague, May 15 - 20, 2011. Chair: Jaroslav Bielcik.
► QM2011, Annecy, May 23 - 28, 2011. Deadline for abstract submission: April 8th, 2011.
► RHIC S&T Review, June 27 - 30, 2011, BNL.
► PANIC2011, MIT, July 24 - 29, 2011.
STAR Management Meeting
BNL, 50-I-189, at 14:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 82633 // Password: 0952
Time: 11 AM - 12 PM EDT
*--===================================================================--*
I. Agenda:
1) Run11 preparation - Bill
2) Run10 200 GeV production - Jerome/Gene
3) APS Spring abstracts - Bedanga
4) DY Effort in STAR - Bernd
5) New institute for STAR - Nu
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency:
1)
III. Note:
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Analysis Meeting, BNL, March 14 - 18, 2011. Chair: Jamie Dunlop.
► DIS2011, Newport News, April 11 - 15, 2011.
► APS Spring Meeting, Anaheim, April 30 - May 3, 2011. Deadline for abstract submission: January 14th, 2011.
► STAR Collaboration Meeting, Prague, May 16 - 21, 2011. Chair: Jaroslav Bielcik.
► QM2011, Annecy, May 23 - 28, 2011. Deadline for abstract submission: April 1st, 2011.
► RHIC S&T Review, June 27 - 30, 2011, BNL.
► PANIC2011, MIT, July 24 - 29, 2011.
STAR Management Meeting
BNL, 50-I-189, at 14:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 82633 // Password: 0952
Time: 9 - 10 AM EST
*--===================================================================--*
I. Agenda:
1) Run11 preparation - Bill
2) Run10 200 GeV production - Jerome/Gene
3) New conveners: an update - Nu
4) BUR12 committee membership - Nu
5) TBD
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency: Jamie, Flemming, Jerome, Gene, Olga, Helen, Nu, Bedanga, Bill
1) Run10 production: HPSS speed. Tape drive (LT04 or LT05). New one in two-three weeks. Production: going fine.
// QA: ok more to come.// Mention OSG in S&T review talk. Jerome will think about it and provide words. // new tracking evaluation //
revisit Run 10 Production plan
2) Run11: new RF 9MHz, reduce the diamond size // no collisions yet // Friday we may see collisions // no polarization measurement
// FMS problem, large cells gain shift with the field. Triiger including large cells? // slow control parameters // slow control code
should be in cvs //
3)
III. Note:
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Analysis Meeting, BNL, March 14 - 18, 2011. Chair: Jamie Dunlop.
► DIS2011, Newport News, April 11 - 15, 2011.
► APS Spring Meeting, Anaheim, April 30 - May 3, 2011. Deadline for abstract submission: January 14th, 2011.
► STAR Collaboration Meeting, Prague, May 16 - 21, 2011. Chair: Jaroslav Bielcik.
► QM2011, Annecy, May 23 - 28, 2011. Deadline for abstract submission: April 15th, 2011.
► RHIC S&T Review, June 27 - 30, 2011, BNL.
► PANIC2011, MIT, July 24 - 29, 2011.
STAR Management Meeting
BNL, 50-I-189, at 14:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 82633 // Password: 0952
Time: 9 - 10 AM EST
*--===================================================================--*
I. Agenda:
1) Run11 preparation - Bill
2) Run10 200 GeV production - Jerome/Gene
3) DY meeting at BNL - Bernd
4) TBD
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency:
1)
III. Note:
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Analysis Meeting, BNL, March 14 - 18, 2011. Chair: Jamie Dunlop.
► DIS2011, Newport News, April 11 - 15, 2011.
► APS Spring Meeting, Anaheim, April 30 - May 3, 2011. Deadline for abstract submission: January 14th, 2011.
► STAR Collaboration Meeting, Prague, May 16 - 21, 2011. Chair: Jaroslav Bielcik.
► QM2011, Annecy, May 23 - 28, 2011. Deadline for abstract submission: April 15th, 2011.
► RHIC S&T Review, June 27 - 30, 2011, BNL.
► PANIC2011, MIT, July 24 - 29, 2011.
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 82633 // Password: 0952
Time: 9 - 10 AM EST
*--===================================================================--*
I. Agenda:
1) Run11 preparation - Bill
2) Run10 200 GeV QA - Jerome/Gene/Bedanga
3) STAR & eSTAR R&D issues - Flemming and All
4) BUR12 committee - Nu
5) TBA
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency: Jerome, Flemming, Jamie, Bedanga, Olga, Bernd, Nu, Zhangbu
1) Run10 data QA: No major problem // Streams discussions on trigger board // Bedanga: potential centrality issue, not fully understood
the 17% reduction in Run10 / New tracking parameters test? / PWG will ask a person to check the data, one person. Hiroshi. / TOP pid: //
2) STAR & eSTAR R&D: Flemming: a meeting is necessary, March 9. Make sure folks for Calorimeters, RP, ... are all at the meeting. / Bernd:
STAR DY meeting on Feb. 13th. Steve H and Carl will lead the effort. Start 8 am. / Olga: UIC high physics folks, D0 muon system for STAR?
Olga start the discussion with few more people and make a recommendation at the next Thursday meeting. The D0 NIM paper is attached at
the meeting announcement.
3) Jerome: need the info about run plan for FY11, 12 and 13 for a new computing equ. planning.
III. Note:
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Analysis Meeting, BNL, March 14 - 18, 2011. Chair: Jamie Dunlop.
► DIS2011, Newport News, April 11 - 15, 2011.
► APS Spring Meeting, Anaheim, April 30 - May 3, 2011. Deadline for abstract submission: January 14th, 2011.
► STAR Collaboration Meeting, Prague, May 16 - 21, 2011. Chair: Jaroslav Bielcik.
► QM2011, Annecy, May 23 - 28, 2011. Deadline for abstract submission: April 15th, 2011.
► RHIC S&T Review, June 27 - 30, 2011, BNL.
► PANIC2011, MIT, July 24 - 29, 2011.
STAR Management Meeting
BNL, 50-I-189, at 14:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 82633 // Password: 0952
Time: 9 - 10 AM EST
*--===================================================================--*
I. Agenda:
1) Run11 preparation - Bill
2) Run10 200 GeV QA - Jerome/Gene/Bedanga
3) QM2011 abstract - Bedanga
4) BUR12 Committee - Nu
5) Spin PWG convener - Nu
6) TBD
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency: Gene, Jerome, Olga, Helen, Bernd, Jamie, Flemming, Nu, Bill
1) new convener for Spin PWG: Renee
2) BUR12 committee: waiting for BNL charges
3) QM2011 abstract: abstracts go to PWG by end of Feb. // Nu contact Jaro about STAR collaboration meeting at Prague
4) JetCorr new convener candidate. More young conveners with fresh mind are needed.
5) Run11: STAR is progressing well including trigger detectors and FMS // CAD is still working on the collider
6) DY DIscussions on Sunday, Feb. 13, 2011. (9 am - 13 pm):
- Participants: Carl, Steve H., Steve T., Ernst, Haun, Flemming, Bernd, Nu
- Talks: Carl: talk ppt file // Steve H.: Talk ppt file
- To Do List: (1) Carl and Steve H. will outline the physics of future forward physics(W) at STAR; (2) Steve H.
will discuss with Mark and Nu will discuss with Feng and Jianwei about the physics of polarized p on nuclear
targets; (3) Simulations are urgent now. WIll discuss with Jamie and Jerome about Jnsen's involvement;
(4) Decadal Plan suplement documents due on Friday, May 13th, 2011 in preparation for the PAC meeting
during June 6-7-8. Results of simulations are needed in the new documents. (5) Calorimenter proposal from
UCLA group will move forward.
III. Note:
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Analysis Meeting, BNL, March 14 - 18, 2011. Chair: Jamie Dunlop.
► DIS2011, Newport News, April 11 - 15, 2011.
► APS Spring Meeting, Anaheim, April 30 - May 3, 2011. Deadline for abstract submission: January 14th, 2011.
► STAR Collaboration Meeting, Prague, May 16 - 21, 2011. Chair: Jaroslav Bielcik.
► QM2011, Annecy, May 23 - 28, 2011. Deadline for abstract submission: April 8th, 2011.
► RHIC S&T Review, June 27 - 30, 2011, BNL.
► PANIC2011, MIT, July 24 - 29, 2011.
STAR Management Meeting
BNL, 50-I-189, at 14:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 82633 // Password: 0952
Time: 9 - 10 AM EST
*--===================================================================--*
I. Agenda:
1) Run11 Status - ANDY issue - Bill / All
2) HFT reviews - Flemming
3) DAQ10k upgrade - Jamie / Tonko / Zhangbu
4) STAR Forward Physics activities - Nu
5) Analysis SPC - Olga
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency: Olga, Flemming, Bedanga, Jamie, Bernd, Nu, Gene, Jerome, Helen, Bill
1) D0 muon system: Olga and Nu will discuss with Steve H. to see if it useful for STAR future physics program
2) HFT status: BNL review week of March 21 or 28. Six to eight weeks later will be DOE review.
3) DAQ10k upgrade: Intend to double the speed of trigger. Remove some bottle necks in both soft- and hardwares. Involves
Tanto, Zhangbu, and others.e-mu, mu-mu measurements, for example. Need a review committee:
4) Run11, ANDY: STAR is fine, FMS trgger is to be ready this night. CAD performence is not good. 9MHz tried, quited,
cannot come back to original settings. Setup rotaters for PHENIX.
ANDY: no systematic measure yet (Bill). ANDY is not really the trouble yet. The effect is not only about the luminosity,
background is also an imprtant issue. Need to quatify the effect. Bernd will prepare the document.
5) Analysis meeting:
6) Forward Physics simulations:
III. Note:
► Charges to eSTAR Task Force, co-Chairs: Ernst Sichtermann and Zhangbu Xu
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Analysis Meeting, BNL, March 14 - 18, 2011. Chair: Jamie Dunlop.
► DIS2011, Newport News, April 11 - 15, 2011.
► APS Spring Meeting, Anaheim, April 30 - May 3, 2011. Deadline for abstract submission: January 14th, 2011.
► STAR Collaboration Meeting, Prague, May 15 - 20, 2011. Chair: Jaroslav Bielcik.
► QM2011, Annecy, May 23 - 28, 2011. Deadline for abstract submission: April 8th, 2011.
► RHIC S&T Review, June 27 - 30, 2011, BNL.
► PANIC2011, MIT, July 24 - 29, 2011.