Attendees: Jeff L., Jérôme L., Wayne B., Gene V.B., Leve H., Dmitry A.

 

Minutes:

 

jevp : the new online QA package

  • Deployment intended before run starts
    • Will run concurrently with OnlinePlots package on the evp.starp machine
      • That machine is believed, at this point, to be sufficiently up to the task
  • Infrastructure ready at 90% (old adage: last 10% takes 90% of the time)
    • Using QtRoot
  • New architecture has 3 components
    • server: repository for plots
    • builder: stand-alone process for reading event pool, filling hists, and ships plots of them to the server in a ROOT container class (StJEvpPlotSet)
      • StJevpPlotSet contains the histograms, plus lines and texts, and axis scales
    • display: it asks the server for the plots it wants to present at any given time (and tabs); not the content of other plots
  • All components communicate over ethernet and can be on separate machines
    • Multiple builder instances will all read the same files simultaneously
    • Suggestion to possibly leverage other available online nodes
      • Would need to mount evp.starp: /a
      • Won't pursue until a need is shown
  • Deployed all existing plots to server (999 exactly!)
    • Divided into 17 builders: generic, daq, hlt, l3, each subsystem
  • Main features:
    • Easily configured plotting
      • There is an xml configuration file, plus an editor for managing the xml file
      • Hierarchy of tabs and plots easily changed (directory-like arrangement)
      • Top level is shift, HLT, other expert sets
      • Same plot can be in more than one place
      • Control over rows and columns, log scaling (part of plot definition, but over-ridable in the configuration), plot maxima and minima (setting can span multiple plots)
      • Display comes up with shift histograms by default
    • Reference histogram capability
      • Clicking on a hist brings up the data and reference histograms (and possible old references)
      • This page allows one to set the data as the reference along with a comment
      • Discussion of expanding this capability for automated analysis and alerts
        • Analytic comparisons be done in the builder (that's where the analysis happens)
        • Suggestions to keep this in mind as programming continues
  • Future Planned Features:
    • Conditional suppression of unwanted plots
      • Distinction between not-in-run, and broken
      • Some plots shown only if some state exists
    • Fast trigger stream: possible send all trigger data (not DAQ data) to the event pool
    • Monitors from within the package (e.g. how long does each builder take)
      • Needs to be coordinated in the server
  • Additional To-Do tasks:
    • Run stop/start isn't well-coordinated yet (when to clear histograms for start of a new run; codes need more understanding of state)
    • Basic shift histogram group needs to be set-up
      • Plan: present a set of plots to the trigger board for feedback & input
    • Need testing with real data for each subsystem for possible code-copying mistakes
    • Need extended operation testing (e.g. does it have memory leaks? eventually crashes?)
      • Already some concerns about ownership of objects in the plotting code (an issue we had with the OnlinePlots package)
    • Plan to run display component locally on rts01
      • Needs STAR environment to do so
      • Interest in a second display screen
      • Interest in upgrading rts01 hardware
        • Wayne agreed to spec out new hardware
  • Plan to learn as we go (from problems during the Run) of what are the optimal ways to present data which make the problem(s) evident
  • Plan for now is to demo the jevp package in 3 weeks time

 

Other discussion topics:

  • Rotations of DBs done for new year, but not all hyperlinks have been rotated
  • Online disk space usage needs: users need to be polled (e.g. spin QA programs and data), and who the users are needs to be determined
  • Solaris phase out: systems (slow controls and trigger) are not in S&C control; admins need to be convinced that support is gone and catastrophes loom (e.g. ITD can disconnect machines from the network)
  • Switch to using dbbak for daily DB backups not yet done
  • DB flush planned for Monday, and that should be it until online daemons start up (awaits EPICS ramp up)
  • Jérôme mentioned workflow tests are in order for QA-RunLog-ShiftLog interconnections
  • Discussion of RTS/ShiftLeader status editing/updating (continued post-meeting):
    • Conclusion seemed to be that the current set-up is what is needed, but that edits/updates should be in the hands of shift leaders. This policy should be made very clear and known.

 

Other issues

B - slope status

Speaker : Tomek Obrebski ( Politechnika Warszawska (WUT) )


Talk time : 11:00, Duration : 00:45

Status and progress of A_N paper

TOF trigger and summary presentation

Speaker : Yury Gorbunov ( Creighton University )


Talk time : 14:00, Duration : 00:30

Analysis status

Phi analysis

Speaker : Jonathan Bruckman ( Creighton University )


Talk time : 14:30, Duration : 00:30

Run 11 preparation meeting #1

2010-11-05 16:00
2010-11-05 17:00
America/New York
Friday, 5 November 2010
1-189, EVO, at 20:00 (GMT), duration : 01:00
For guidance, our flagship projects for Year 10 from last
year included:
* Online storage / central storage
* Revamping the online network
* Auto-calib and Auto-QA projects
* New online plots
* Try to make good on code in CVS

We would need to hear about
- QA (online and offline) - assume Gene will compile a summary
- Online tools ShiftSignup, RunLog, ShiftLog - Dmitry & Leve
- Production requests during yhe run - Lidia
- DB issues if any remaining - Dmitry
- Storage and other issues - Wayne

 As first action items, we will also need as every year
to (a) poll users for storage requirements online and (b) be sure
all DB back-end supporting all tools are rotated and ready (and all
links / generic names are as well for Run 11). If you need storage
space online and have a opinion, please voice it especially if
need diverge from past year's.

Update on J/psi polarization study

Speaker : Barbara Trzeciak ( WUT )


Talk time : 14:00, Duration : 00:45

Hypertriton Analysis at BES 7.7 and 11.5GeV

K0s, lambda, xi production in beam energy scan

Update on jet shapes analysis (via EVO)

Analysis update (via EVO)

Gamma-Hadron 2D Correlations (via EVO)

Asymmetric azimuthal correlation

System size dependence on 2D two particle number correlations

Update on 2+1 analysis

b parameter

Speaker : Tomek Obrebski


Talk time : 14:00, Duration : 14:20

STAR Management Meeting

2010-12-23 10:00
2010-12-23 11:00
America/New York
Thursday, 23 December 2010
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00