STAR Protected
Run 11 preparation meeting #1
1-189, EVO, at 20:00 (GMT), duration : 01:00
For guidance, our flagship projects for Year 10 from last year included: * Online storage / central storage * Revamping the online network * Auto-calib and Auto-QA projects * New online plots * Try to make good on code in CVS We would need to hear about - QA (online and offline) - assume Gene will compile a summary - Online tools ShiftSignup, RunLog, ShiftLog - Dmitry & Leve - Production requests during yhe run - Lidia - DB issues if any remaining - Dmitry - Storage and other issues - Wayne As first action items, we will also need as every year to (a) poll users for storage requirements online and (b) be sure all DB back-end supporting all tools are rotated and ready (and all links / generic names are as well for Run 11). If you need storage space online and have a opinion, please voice it especially if need diverge from past year's.
Update on J/psi polarization study
Updated on Mon, 2010-11-15 13:18 by trzeciak. Originally created by dongx on 2010-11-05 01:28.Reference
Speaker : Barbara Trzeciak ( WUT )
Talk time : 14:00, Duration : 00:45
Search for QCD Critical Point: Higher Moments of Net-proton Multiplicity Distributions at RHIC
Updated on Mon, 2010-11-15 15:23 by luoxf. Originally created by ruanlj on 2010-11-04 13:46.Reference
Speaker : Xiaofeng Luo
Talk time : 16:00, Duration : 00:45
Hypertriton Analysis at BES 7.7 and 11.5GeV
Updated on Sat, 2010-11-13 14:25 by yhzhu. Originally created by ruanlj on 2010-11-04 13:23.Reference
Speaker : Yuhui Zhu
Talk time : 12:30, Duration : 00:30
K0s, lambda, xi production in beam energy scan
Updated on Sat, 2010-11-13 09:11 by zhux. Originally created by ruanlj on 2010-11-04 13:16.Reference
Speaker : Xianglei Zhu
Talk time : 10:00, Duration : 00:30
Update on jet shapes analysis (via EVO)
Updated on Mon, 2010-11-15 15:19 by alandav1. Originally created by fqwang on 2010-11-04 10:55.Reference
Speaker : Alan Davila ( UT Austin )
Talk time : 16:00, Duration : 00:30
Analysis update (via EVO)
Updated on Mon, 2010-11-15 13:59 by kapitan. Originally created by fqwang on 2010-11-04 10:54.Reference
Speaker : Jan Kapitan ( NPI )
Talk time : 15:00, Duration : 00:30
Gamma-Hadron 2D Correlations (via EVO)
Updated on Sat, 2010-11-13 15:55 by martinc. Originally created by fqwang on 2010-11-04 10:51.Reference
Speaker : Martin Codrington ( Texas A&M )
Talk time : 16:45, Duration : 00:45
Asymmetric azimuthal correlation
Updated on Sat, 2010-11-13 14:47 by jrkonzer. Originally created by fqwang on 2010-11-04 10:50.Reference
Speaker : Joshua Konzer ( Purdue )
Talk time : 16:00, Duration : 00:45
System size dependence on 2D two particle number correlations
Updated on Sat, 2010-11-13 14:03 by desilva. Originally created by fqwang on 2010-11-04 10:49.Reference
Speaker : Chanaka De Silva ( UT Austin )
Talk time : 14:45, Duration : 00:45
Update on 2+1 analysis
Updated on Sat, 2010-11-13 13:49 by huapei. Originally created by fqwang on 2010-11-04 10:48.Reference
Speaker : Hua Pei ( UIC )
Talk time : 14:00, Duration : 00:45
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 72047 // Password: 0952
Time: 11 AM - 12 PM EDT
*--===================================================================--*
I. Agenda:
1) Run11 preparation - Bill
2) Run10 200 GeV production - Jerome/Gene
3) Recent talk issue - Nu
4) Decadal Plan and eSTAR Task Forces - Nu
5) FGT - Nu/Bernd/Flemming
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency: Jerome, Flemming, Bedanga, Jamie, Gene, Nu, Bernd, Bernd
1) Run10 production: Despite the problem on rcf, the STAR 's goals for QM11 will be fine. The productions are expected to be completed three weeks from Dec. 15th, 2010.
2) QM11: STAR topics, deadline (Feb. 28). Start the discussions with PWGs.
3) Decadal plan: submit it asap and start the eSTAR task force. Prepare the STAR workshop on EIC physics and R&D processes.
4) FGT project: Have a meeting before Friday FGT Quartly Review.
III. Note:
► BNL PAC report June 2010.
► Charge for New Decadal Plan, Steve Vigdor, Dec. 17, 2009
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
►
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 72047 // Password: 0952
Time: 11 AM - 12 PM EDT
*--===================================================================--*
I. Agenda:
1) Run11 preparation - Bill
2) Run10 200 GeV production - Jerome/Gene
3) eSTAR Task Force - Nu
4) TBD
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency: Bill, Jerome, Olga, Bernd, Bedanga, Flemming, Nu, Jamie
0-1) Olga requested new time for the management meeting. WIll be discussed later.
1) Run11 preparation: No major problems. / BBC is ready except a large tile, No major problem. / CAD will start cooling down on Jan. 3rd.
PHENIX is also ready./ 500 GeV transverse first for FMS, five weeks.
2) Run10 productions: Repaires are mostly done. Production is on schedule. / Analysis farm: / Job efficiency: / 17 days to go! / Reminder: HT
entire stream through the entire period of datasetp. / vertex: / Simulations for FMS: codes problem. /
3) eSTAR task force: Ernst Sichtermann and Zhangbu Xu will co-chair the task force.
III. Note:
► Charge for New Decadal Plan, Steve Vigdor, Dec. 17, 2009
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Analysis Meeting, BNL, March 14 - 18, 2011. Chair: Jamie Dunlop.
► DIS2011, Newport News, April 11 - 15, 2011.
► APS Spring Meeting, Anaheim, April 30 - May 3, 2011. Deadline for abstract submission: January 14th, 2011.
► STAR Collaboration Meeting, Prague, May 16 - 21, 2011. Chair: Jaroslav Bielcik.
► QM2011, Annecy, May 23 - 28, 2011. Deadline for abstract submission: April 1st, 2011.
► PANIC2011, MIT, July 24 - 29, 2011.
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 72047 // Password: 0952
Time: 11 AM - 12 PM EDT
*--===================================================================--*
I. Agenda:
1) Run11 preparation - Bill
2) Preparation for the Collaboration Meeting - Jamie
3) Rotation of the Talk Committee Membership: Nu
4) Decadal Plan: Nu
5) Next Analysis Meeting (03/14-18/2011): Nu
6) Message to CMS: Jamie
7) Run8 dAu paper: Nu
9) TBA
*--===================================================================--*
II. Brief Summary and/or Action Items:
1) Attendency:
2)
III. Note:
► BNL PAC report June 2010.
► Charge for New Decadal Plan, Steve Vigdor, Dec. 17, 2009
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Collaboration Meeting: Nov. 12 - 17, 2010, BNL. Chair: J. Dunlop
► ICPAQGP2010: Dec. 6 - 10, 2010, Goa, India
► STAR Analysis Meeting: March 14 - 18, 2011. BNL. Chair J. Dunlop
► APS April Meeting: April 30 - May 3, 2011, Anaheim, California. ()
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00
STAR Management Meeting
BNL, 50-I-189, at 15:00 (GMT), duration : 01:00