STAR Protected
STAR Management Meeting
BNL, 50-I-189, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 39499 // Password: 0952
Time: 11 AM - 12 PM EDT
*--===================================================================--*
I. Agenda:
1) Run10 status - Bill
2) FMS and Relted Issues - Nu
3) Coll. Mtg Preparation - Jamie
4) BUR11 (BES II, U+U, 500GeV pp) - Nu
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency
III. Note:
► RHIC Planning Meeting Website
► Charge for New Decadal Plan, Steve Vigdor, Dec. 17, 2009
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► APS April Meeting: Feb. 13-17, 2010, Washongton DC
► STAR Collaboration Meeting: March 26 - 31, 2010, BNL. Chair: J. Dunlop
► RHIC and AGS User's Annual Meeting: June 7-11, 2010, BNL
► STAR Analysis Meeting: June 15-18, 2010, UCLA. Chair: H. Huang
► RHIC PAC Meeting: June 21-23, 2010, BNL
► RHIC Science and Technology Review: June 28-30, 2010, BNL
► Spin2010: Sept. 27 - Oct. 2, 2010, Juelich, Germany
► DNP2010: Nov. 3-6, 2010, Santa Fe, NM
FL and the statistics/rates needed to make the measurement
Updated on Mon, 2010-03-08 23:31 by ramdebbe. Originally created by dunlop on 2010-03-08 15:33.Reference
Speaker : R. Debbe
Talk time : 15:00, Duration : 00:30
From pp2pp to diffractive measurement in eSTAR
Updated on Tue, 2010-03-09 09:55 by jhlee. Originally created by dunlop on 2010-03-08 15:22.Reference
Speaker : J.H. Lee
Talk time : 14:30, Duration : 00:30
New calorimetric technology for eRHIC
Updated on Tue, 2010-03-09 13:57 by tsay. Originally created by dunlop on 2010-03-08 15:22.Reference
Speaker : O. Tsai
Talk time : 14:00, Duration : 00:30
Kinematics and implications for physics reach
Updated on Mon, 2010-03-08 15:32. Originally created by dunlop on 2010-03-08 15:21.Reference
Speaker : J. Dunlop
Talk time : 12:30, Duration : 00:30
Some thoughts on detector requirements
Updated on Tue, 2010-03-09 11:31 by surrow. Originally created by dunlop on 2010-03-08 15:19.Reference
Speaker : B. Surrow
Talk time : 12:00, Duration : 00:30
Detector concepts for MeRHIC and implications for eSTAR
Updated on Mon, 2010-03-08 15:55 by macl. Originally created by dunlop on 2010-03-08 15:18.Reference
Speaker : M. Lamont
Talk time : 11:30, Duration : 00:30
Key measurements in eA at an eSTAR
Updated on Tue, 2010-03-09 09:48 by ullrich. Originally created by dunlop on 2010-03-08 15:18.Reference
Speaker : T. Ullrich
Talk time : 11:00, Duration : 00:30
Overview of key polarized ep measurements and detector needs:
Updated on Wed, 2010-03-10 17:57 by sichterm. Originally created by dunlop on 2010-03-08 15:17.Reference
Speaker : E. Sichtermann
Talk time : 10:30, Duration : 00:30
Overview of eRHIC and MeRHIC proposal Status
Updated on Tue, 2010-03-09 09:45 by ullrich. Originally created by dunlop on 2010-03-08 15:16.Reference
Speaker : T. Ullrich
Talk time : 10:00, Duration : 00:30
Discussion
Updated on Tue, 2010-03-09 08:38. Originally created by dunlop on 2010-03-08 15:14.Time | Talk | Presenter |
---|---|---|
10:00 | Overview of eRHIC and MeRHIC proposal Status ( 00:30 ) 1 file | T. Ullrich |
10:30 | Overview of key polarized ep measurements and detector needs: ( 00:30 ) 1 file | E. Sichtermann |
11:00 | Key measurements in eA at an eSTAR ( 00:30 ) 1 file | T. Ullrich |
11:30 | Detector concepts for MeRHIC and implications for eSTAR ( 00:30 ) 1 file | M. Lamont |
12:00 | Some thoughts on detector requirements ( 00:30 ) 1 file | B. Surrow |
12:30 | Kinematics and implications for physics reach ( 00:30 ) 2 files | J. Dunlop |
14:00 | New calorimetric technology for eRHIC ( 00:30 ) 2 files | O. Tsai |
14:30 | From pp2pp to diffractive measurement in eSTAR ( 00:30 ) 1 file | J.H. Lee |
15:00 | FL and the statistics/rates needed to make the measurement ( 00:30 ) 1 file | R. Debbe |
STAR Decadal Plan Discussion I: eRHIC, meRHIC
Updated on Wed, 2010-03-10 08:00 by jeromel. Originally created by dunlop on 2010-03-08 15:13.3-192
Nu Xu, Carl Gagliardi
Discussion of STAR in the time of meRHIC and eRHIC
Documentation- storage and control
Reference
Talk time : 14:00, Duration : 00:30
Adept, web server, control documents
Overflow if need be
Reference
Talk time : 10:30, Duration : 00:30
HFT management
Reference
Talk time : 09:00, Duration : 01:30
HFT bi-monthly- day 2
2-84 BNL, at 14:00 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
09:00 | HFT management ( 01:30 ) 1 file | |
10:30 | Overflow if need be ( 00:30 ) 2 files | |
11:00 | Integration - interface specifications ( 01:00 ) 4 files | |
13:30 | Grounding plans ( 00:30 ) 0 files | |
14:00 | Documentation- storage and control ( 00:30 ) 4 files | |
14:30 | preparation for TDR, WBS and near term plans ( 00:30 ) 0 files |
D.Beavis
Reference
Speaker : Beampipe - Safety ( BNL )
Talk time : 15:20, Duration : 00:30