STAR Protected

2009.11.10 BEMC sampling fraction and clustering

Monte-Carlo setup:

Physics of HFT in STAR

Speaker : N. Xu


Talk time : 09:30, Duration : 00:45

Run 10 preparation meetings #3

2009-10-30 15:00
2009-10-30 17:00
Etc/GMT-5
Friday, 30 October 2009
1-189, EVO, at 19:00 (GMT), duration : 02:00
TimeTalkPresenter
15:00General introduction ( 00:20 ) 1 fileJerome Lauret (BNL)
15:20Storage and network project ( 00:20 ) 3 filesWayne Betts (BNL)

2009.11.06 new EEMC geometry: Pure lead and new SMD layers

Monte-Carlo setup:

x0/y0 into the Geometry/pp2pp database

Hi,

I've written our x0,y0 offset (13 sets) --- each set contains a row of 32 numbers --- into the database of Geometry/pp2pp of StarDb in the table of "pp2ppOffset".

"One set of pedestal in StarDb, written & read & used" (An email sent on Oct. 15, 2009)

Oct 15, 2009

Ivan's Presentation

Speaker : Ivan Koralt ( ODU )


Talk time : 14:00, Duration : 00:20

My recent work.

pp2pp Test Meeting

2009-11-04 14:00
2009-11-04 15:00
US/Eastern
Wednesday, 4 November 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Example of a meeting...

TimeTalkPresenter
14:00Ivan's Presentation ( 00:20 ) 1 fileIvan Koralt (ODU)

pp2pp Meeting

2009-12-30 14:00
2009-12-30 15:00
US/Eastern
Wednesday, 30 December 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Discussion of pp2pp analysis.

Description: pp2pp weekly
Community: Universe
Password: WeeklyElastic


- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavsvaauaDaIIt

- Password: WeeklyElastic
- Phone Bridge ID: 42134  Password: 9771

EVO Phone Bridge Telephone Numbers:

- USA (Caltech, Pasadena, CA) +1 626 395 2112

- USA (BNL, Upton, NY) +1 631 344 6100
 

pp2pp Meeting

2009-12-16 14:00
2009-12-16 15:00
US/Eastern
Wednesday, 16 December 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Discussion of pp2pp analysis.

Description: pp2pp weekly
Community: Universe
Password: WeeklyElastic


- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavsvaauaDaIIt

- Password: WeeklyElastic
- Phone Bridge ID: 42134  Password: 9771

EVO Phone Bridge Telephone Numbers:

- USA (Caltech, Pasadena, CA) +1 626 395 2112

- USA (BNL, Upton, NY) +1 631 344 6100
 

pp2pp Meeting

2009-12-02 14:00
2009-12-02 15:00
US/Eastern
Wednesday, 2 December 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Discussion of pp2pp analysis.

Description: pp2pp weekly
Community: Universe
Password: WeeklyElastic


- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavsvaauaDaIIt

- Password: WeeklyElastic
- Phone Bridge ID: 42134  Password: 9771

EVO Phone Bridge Telephone Numbers:

- USA (Caltech, Pasadena, CA) +1 626 395 2112

- USA (BNL, Upton, NY) +1 631 344 6100
 

pp2pp Meeting

2009-11-18 14:00
2009-11-18 15:00
US/Eastern
Wednesday, 18 November 2009
510 1-189, at 19:00 (GMT), duration : 01:00

Discussion of pp2pp analysis.

We'll have our biweekly meeting Wednesday Nov. 18 at 2 p.m. in 1-189 in Physics. Please use headsets if you are using a laptop to avoid echo. Otherwise please mute when you are not talking, for the same reason. Please post your talks/comments on the Drupal website.

1. Progress report on transport calculation - Todd
 
2. Update from Donika and Ivan
 
3. Other updates - let me know
 

Description: pp2pp weekly
Community: Universe
Password: WeeklyElastic


- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavsvaauaDaIIt

- Password: WeeklyElastic
- Phone Bridge ID: 42134  Password: 9771

EVO Phone Bridge Telephone Numbers:

- USA (Caltech, Pasadena, CA) +1 626 395 2112

- USA (BNL, Upton, NY) +1 631 344 6100
 

TimeTalkPresenter
14:00After Alignment ( 00:20 ) 1 fileKin Yip
14:20RHIC pp2pp Optics Update ( 00:20 ) 1 fileTodd Satogata (BNL)
14:40Acceptance Simulations for Run09 ( 00:20 ) 1 fileDonika Plyku

2009.11.03 Jason EEMC geometry: Effect of ELED block change

Monte-Carlo setup:

2009.11.03 BEMC sampling fraction: with and without LOW_EM option

Monte-Carlo setup:

2009.11.02 Jason EEMC geometry: results with and without LOW_EM options

Monte-Carlo setup:

11 Nov

November 2009 posts

STAR Management Meeting

2009-11-05 11:00
2009-11-05 12:00
Etc/GMT-5
Thursday, 5 November 2009
BNL, 50-Orange Room, at 16:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 39499 // Password: 0952

   Time:  11 AM - 12 PM EDT

 * --===================================================================--*

  Agenda:

1) Run10 preparation and TOF problem(?) - Bill

2) FGT instalations - Flemming, Bernd

3) ISMD Proceedings - Nu

4) TBD

* --====================================================================--*

               Brief Summary:

  0) Attendency:

  Notes:

   1) STAR TPC Review (key= star2009),  June 4,5, BNL. Ron Settler (chair). Review report.

   2) NPE Committee, H. Huang (chair) 

   3) STAR TOF Close Out Review, Aug. 10-11. Review report and The Plan.

   4) STAR FMS Review agenda, Sept. 1-2, BNL, P. Jacobs (chair). Review report

              

               Future Meetings:

    1) STAR-DoE HFT CD-1 review, postpond to Nov. 12-13, BNL.

        The rehearsal is scheduled on Thursday and Friday, Oct. 29 and 30th.

    2) STAR Analysis Meeting, Jan. 11-15, 2010, UT Austin

    3) APS April meeting, Feb. 13-17, 2010, Washongton DC.

2009.10.30: Jason EEMC geometry: Jason with ELED block from CVS file

FYI: Alice blog on ELED block study

Monte-Carlo setup:

Project Overview

Speaker : F.Videbaek


Talk time : 14:35, Duration : 00:20

STAR Management Meeting

2009-10-29 11:00
2009-10-29 12:00
Etc/GMT-7
Thursday, 29 October 2009
BNL, 50-Orange Room, at 15:00 (GMT), duration : 01:00

EVO: Title: STAR Management Meeting // Community:  STAR // Password:  star

           Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 39499 // Password: 0952

   Time:  11 AM - 12 PM EDT

 * --===================================================================--*

  Agenda:

1) Run10 preparation - Bill

2) FHC - Flemming

3) Double credits for shifts over Xmas and New Year's day?

4) TBD

* --====================================================================--*

               Brief Summary:

  0) Attendency:

  Notes:

   1) STAR TPC Review (key= star2009),  June 4,5, BNL. Ron Settler (chair). Review report.

   2) NPE Committee, H. Huang (chair) 

   3) STAR TOF Close Out Review, Aug. 10-11. Review report and The Plan.

   4) STAR FMS Review agenda, Sept. 1-2, BNL, P. Jacobs (chair). Review report

              

               Future Meetings:

    1) STAR-DoE HFT CD-1 review, postpond to Nov. 12-13, BNL.

        The rehearsal is scheduled on Thursday and Friday, Oct. 29 and 30th.

    2) STAR Analysis Meeting, Jan. 11-15, 2010, UT Austin

    3) APS April meeting, Feb. 13-17, 2010, Washongton DC.