SubSystems

Escope traces

Under:

Here are some scope traces took on Feb 26, 2019, with beam:

Ch1: EPD East Position 1, Tile 31 (last/outer tile)
Ch2: QTB clock
Ch3: QTC clock

Operations 2019

Under:

Machine Learning

Under:

Introduction/purpose

SW FEE box Removal

Under:

Pre- and post-beam commissioning

Under:
Post-installation / pre-beam commissioning

What supersector, fiberbundle, FEE, and SiPM is where?

Under:
Prashanth maintains a page of the complete EPD mapping.  Here, the focus is to record which supersector and fiber

HLT QA

Under:

 

Mapping

Under:

For the current mapping file, look for "Current" in the Attached Files at the bottom of this page.

EPD racks in plat form

Under:

EPD uses 1C2 and 1C3 racks in the south platform:
Here is the drawing of the racks:

Operations 2018

Under:

VPD Run18 HV Map

Under:

 

VPD Run17 HV Map

Under:

 

Hardware mapping for Run 2017

Under:
Hardware map for run 2017

It is important to maintain a record of the correspondence between (physical) supersector number (SS), position on the detector (PP) in any given run.

TRG

Under:

Vpd Simulation Database Table

Under:

 Variables:

FCAL

Under:

This is a test page ...

Older material

Under:

 

****Some links from 2011 tracking review:

Tracking Focus Work

Under:

 Meetings [newer on top]

VPD

 Procedural Notes and Run Operations 

Detector package information

Under:
Detector package information