TOF

Run 11 - 62 GeV Calibration

Under:

Place holder.  40ns.

Run 10 - 200 GeV Calibrations

Under:

Run 10 Calibrations

 

Run 10 200 GeV FF


[This a test page for now.  Soon to be edited.]

 

BTOF Offline Reconstruction

Under:

BTOF Offline Reconstruction


Add a flag in vpdTotCorr.idl for noVPD start calibration switch

Under:

In low energy runs, the VPD acceptance and efficiency becomes a potential issue.

TOF Error Handling

Under:

Last updated: March 23nd 2010 

Test with real data

Under:

The PPV with BTOF included is then tested with Run 9 real data.

MC study on PPV with BTOF in Run 9 geometry

Under:

This MC simulation study is to illustrate the performance of PPV vertex finder with BTOF added under different pileup assumptions.

Coding

Under:

Checklist:

This list the items that need to be implemted or QAed to include BTOF information in the PPV.

Coding: - almost done, need review by experts

Default PPV for PYTHIA minibias events in y2009

Under:

The first check is to test the default PPV and check whether the result is consitent with those from Vertex-Group experts.

GSTAR setup

geometry y2009

MC simulation study

Under:

PPV with the use of BTOF

Under:

This area contains the study on the Pileup-Proof Vertex (PPV) finder with the use of hits from Barrel Time-Of-Flight (BTOF).

Barrel TOF/CTB Geometry Configurations

Under:

The definitions of Barrel TOF/CTB geometry configurations are shown here:

BtofConfigure = 1;      /// All CTB trays

Proposal of new TOF tables for Run9++ (Jan. 2009)

Under:

We are proposing to create several new TOF tables for future full barrel TOF runs.

Draft IDLs:

Database

Under:

These pages describe how to use the Barrel TOF (including VPD) database.