Run 18 Calibrations

Under:

Isobar Calibrations


27 GeV Calibrations

First Half ( days - 141)

Second Half (days 142-168)

  • VPD calibration QA
  • BTOF alignment
  • BTOF T0
  • Comments:
    • BTOF slewing and Local-Z re-used from past full calibration (Run16)
    • calalgo=1 (startless mode, VPD is not used for the BTOF start time)

Fixed Target Calibrations