iraklic's blog - Run-21 Alignment - November 11., 2022
- Run-21 Alignment - November 11., 2022
- Run-20 Alignment - August 26., 2020
- Run-17 Alignment - May 5., 2020
- Run19 Cosmics and SuperSector Alignment - March 11., 2020
- Cosmic Trigger Comparison - December 8., 2019
- Residuals from iTPC Era - December 5., 2019
- TpcResponseSimulator Calibration - September 30., 2019
- Beam PIPE and related radiation length - August 2., 2019
- FXT T0 Work - July 12., 2019
- dE/dx Calibration Package and iTPC Software - October 9., 2018
- 2018 - Cosmics - March 28., 2018
- ALTRO -> SAMPA Simulation Switch - October 10., 2017
- Effect of a moved fat field wire - January 13., 2017
- Cluster Finer Optimization - October 17., 2016
- Grid Leak Dependence on Inner Sector Anode Voltage - GARFIELD Simulations - June 8., 2016
- Sti vs. StiCA comparison for pp->W->enu process - May 23., 2016
- iTPC with half the electronics - February 1., 2016
- Effect of anode wire shift on grid leak - January 20., 2016
- Garfield Simulation for TPC - Grid Leak Study - November 17., 2015
- Voltage Scan Study from 2009 pp data - September 16., 2015
- Optimizing Altro threshold - September 9., 2015
- Altro 3 vs. Altro 4 - dEdx ADC Correction - August 6., 2015
- Effects of Altro threshold change from currently used 3 to proposed 4 - May 18., 2015
- Bulck Properties of BES I - GPC - March 24., 2015
|