mnaglis's blog - Hit errors for Run11 Au+Au 200 GeV dataset - October 9., 2011
- cuts in the hit errors calibration procedure - September 15., 2011
- Pulls before/after hit errors calibration - September 9., 2011
- TPC Hit Errors (Run11p+p 500 GeV) - September 7., 2011
- TPC Hit Errors (Run11 Au+Au 27 GeV) - September 6., 2011
- calibration delivery timescale1 for Run11 - July 13., 2011
- Mapping between TPC sector/socet and LeCroy powersupply card/channel - May 2., 2011
- residuals in simulation - April 1., 2011
- ideal simulation, check pt distribution for primary and global 0.5 GeV tracks - March 17., 2011
- residuals in simulation done with realistic alignment parameters - March 11., 2011
- confirmation of Nihar's results on residuals for different particle species - March 11., 2011
- low lumi run11? - March 11., 2011
- reconstucted pt in simulation with ideal TPC alignment - March 11., 2011
- draft of the low luminocity fill request - February 10., 2011
- revisiting alignment (macroses only, step 0) - February 3., 2011
- TPC drift velocity monitoring page - February 3., 2011
- TPC drift velocity in the offline DB - February 2., 2011
- TPC status table - February 1., 2011
- Z dependence of residuals - January 17., 2011
|