mnaglis's blog - Z dependence of residuals - January 17., 2011
- transfer files from RCF to PDSF - September 30., 2010
- track residuals for positively and negatively charged tracks - September 20., 2010
- TPC status table - February 1., 2011
- TPC hiterrors Run9 p+p 200 GeV RFF - August 29., 2012
- TPC hiterrors Run12 U+U 193 GeV - September 19., 2012
- TPC Hit Errors (Run11p+p 500 GeV) - September 7., 2011
- TPC Hit Errors (Run11 Au+Au 27 GeV) - September 6., 2011
- TPC drift velocity monitoring page - February 3., 2011
- TPC drift velocity in the offline DB - February 2., 2011
- TPC calibration: Run10 T0 calibration using "prompt" hits - March 16., 2010
- TPC calibration: Run10 final alignment for RFF - November 2., 2010
- TPC calibration: Run10 final alignment for FF - September 30., 2010
- small scale simulation project recipe - August 3., 2010
- Run12 HLT Monitoring - January 21., 2012
- Run 12 T0 calibration - April 11., 2012
- revisiting alignment (macroses only, step 0) - February 3., 2011
- residuals when all padrows are included, Run-10, FF - December 16., 2010
- residuals in simulation done with realistic alignment parameters - March 11., 2011
- residuals in simulation - April 1., 2011
- reconstucted pt in simulation with ideal TPC alignment - March 11., 2011
- Pulls before/after hit errors calibration - September 9., 2011
- Mapping between TPC sector/socet and LeCroy powersupply card/channel - May 2., 2011
- low lumi run11? - March 11., 2011
- looking at laser tracks in sector 20 - November 12., 2010
|