oleg's blog - Run 17 readiness - December 12., 2016
- FPOST: patch panel and QT board mapping - December 6., 2016
- GPC 231: IFF @ 500 GeV - November 8., 2016
- Photon analysis (FMS run 15, part 1) - October 28., 2016
- RHIC polarizations in 2015 - October 17., 2016
- FMS Run 15 QA (p+p 200 GeV) II - August 26., 2016
- FMS Run 15 QA (p+p 200 GeV) - July 7., 2016
- DNP 2016: Physics with (un)polarized Proton-Nucleus Collisions - June 24., 2016
- BBC timing calibration (with slewing correction), run 15 - June 23., 2016
- J/Psi kinematics (200/500 GeV in FMS) - June 3., 2016
- J/Psi mass from toy simulation - May 27., 2016
- Postshower design - May 26., 2016
- C-A time meeting (run 16) - April 26., 2016
- Prepare for dump times - April 22., 2016
- DAQ rates from a good fill - April 2., 2016
- FMS Run 15 Analysis: BBC vertex calibration (II) - March 24., 2016
- FMS Run 15 Analysis: BBC vertex calibration - March 17., 2016
- FMS Run 15 Analysis: Vertex Reconstruction - March 10., 2016
- FMS Run 15 Analysis (Starting Steps) - March 3., 2016
- Comments for FMS paper draft (A_LL, runs 12/13) - January 7., 2016
|