Sort by:[Date]

Two Documents Related To Run 9 FMS calibration

GridLeak update using residuals along padrows

Outline:

ProductionMinBias : MuKPi QA plots

Following are QA plots (day-by-day basis) of some variables filled in D0Tree :

(up to now only for day 124 to day 150, I will add the others later)

Run3(dAu) - Run6(pp) Run8(pp-dAu) HT-2 data comparison and correlation plots

Some basic plots : Run 3 (dAu) :  HT-2  trigger threshod > 4.5GeV (Id: 2202)

Pi0 and Direct photon cross section in Pythia

Direct photon and Pi0 cross section seems to the very different in different Pythia versions.

BSMD Calibration: Fitting to the Means of Momentum Slices

In order to avoid the problem of gaussian fits to momentum slices giving mean values that were unphysically less than zero, we can instead simply calculate the mean of the ADC values in the slice a

HOWTO: Perform regression tests on geometries

# 1) Check the geometry differential code out of CVS and setup the scripts   
$ cvs co StarVMC/StarBASE   
$ ln -s StarVMC/StarBASE/macros/starb   

Shift sign-up, transition toward the extension

Here is a snapshot of the week before and during the extension due date for the 2010 shift sign-up:

Abstract for DIS2010

W Charge Separated Jacobian Peaks for APS 2010, STAR Run 9 Preliminary

Figure approved for APS 2010.  EPS and PNG versions attached below as well as hist.root files and plotting macro in a tarball.