Sort by:[Date]

SL09g test production QA

SL09g test production QA

Small scale Monte Carlo Test Estimate

Method:

readiness of SL09g for W-production (1)

Preparation for W-production in December 8, 2009

 A single daq file from every run used for pp500 W analysis was produced with the chain:

Upsilon Efficiency versus eta-phi for electron daughter

Upsilon 1S+2S+3S used, weighted with:

(TMath::Gaus(upsRap)*upsPt/(exp(upsPt/2.2)+1)

I did not use just |UpsRap|<=0.5 to increase statistics

PWGC Dec. 8, 2009

PPV 500 GeV test run QA - Dec 7

BFC chain:
"pp2009c ITTF VFPPVnoCTB BEmcChkStat beamLine Corr4 OSpaceZ2 OGridLeak3D -dstout -evout"

run in stardev

Run on W triggered events

Double Diffraction Single Slide

one slide from talk on asymmetry in ZDC and BBC

Geometry Differential Framework [first test on EEMC in y2009 vs y2009a]

Abstract: I have developed a prototype geometry differential framework.

Run6 FPD Shower Shape Part 2.

Run6 FPD Shower Shape Simulation and Data Comparison Part 2.

 

20091204 Full Pythia-GSTAR Pilot Run

Full Pythia-GSTAR Pilot Run