Sort by:[Date]

Run9 BTOW HV Mapping Analysis - Part 1

It has been seen that a number of towers are not where we think the are in the HV system (probably a bunch of cables are switched).

The BBC beam background scalers saga

 While studying scalers for SpaceCharge calibration of Run 8 data last summer, I found that the BBC beam background scalers were clearly You do not have access to view this node (regarding which one

Initial ZDC Local Polarimetry Results (Run 9)

Beam polarization values and spin pattern used were determined using cdev files.

ZDC Pol Analysis: runs 10063009-10063016

Introduction

Opened simulation requests 20090304

 

Table summary - simulations in priority order.

STAR pion RAA

Recent precision comparisons between data and energy loss/jet quenching calculations are making serious use of systematic and statistical uncertainties.

toward BTOW HV mapping

 The following runs were taken on March 3rd, runs 10062047-61

 Table 1.

BNL shift accounting, Run 9

Number of shift due by an institution is proportional to the number of authors minus the number of experts.

BSMD and BPRS timing runs 10060041-54

Introduction

 

Timing data were taken for the barrel preshower and shower max early Sunday morning.  From the elog:

Some BSMD spectra

Figure 1: BSMD eta plane spectra for 8 crates, run 10060041