- My blog
- Post new blog entry
- Top bloggers
- Recent posts
Catalog centralized load management, resolving slow querries
General problem
The FileCatalog management from an administrator stand point (i.e.
Slides for A. Gordon (Moriond 2009)
Updated on Mon, 2009-03-09 17:02. Originally created by surrow on 2009-03-09 17:00.
Slides for A. Gordon's talk:
STAR Longitudinal Spin Program
Slide 1: STAR Gluon polarization measurements (ALL Inclusive Jets and Result from global analysis)
ZDC Analysis: Data Taken March 7-8
Updated on Tue, 2009-03-10 12:13. Originally created by aliceb on 2009-03-09 14:42.Introduction
Run9 BTOW HV Mapping Analysis - Part 2
Updated on Sun, 2009-03-08 21:55. Originally created by seelej on 2009-03-08 21:55.Because there was not enough statistics taken in the first mod7 data set to determine the other towers that are swapped, another set with softID%6 was taken in order to determine the rest of the to
BTOW timing runs 10065031-45
Updated on Thu, 2009-03-12 17:51. Originally created by aliceb on 2009-03-08 12:27.Introduction
The following runs were taken for BTOW timing:
QM09 Presentation
Updated on Sun, 2009-03-08 12:17. Originally created by bbiritz on 2009-03-08 12:17.Hi All,
You can find my QM 2009 talk attached. Feedback is sought after.
Thanks,
Bertrand
Analyzing runs 10066001-114
Updated on Mon, 2009-03-09 15:31. Originally created by aliceb on 2009-03-07 16:01.Introduction
Runs analyzed:
Cu+Cu and Au+Au 62.4 GeV cross check
In preperation for QM, I've recently ran over the 62 GeV data in order to cross-check Jun and Marcelo' work.
Run 9 Calibr & QA
Updated on Tue, 2009-03-17 08:14. Originally created by wwjacobs on 2009-03-06 12:56.There are several things collected w/ this entry:
**********************************************************
I. 1st DRAFT OF BPRS HV SETTINGS
Cut Variable and Kinematics Distributions
Updated on Mon, 2009-03-09 11:49. Originally created by fersch on 2009-03-05 16:05.Plots and description are in the attached .pdf file (warning: large file).