Sort by:[Date]

Niseem abstract for Initial Stages 2019

     Title:

Mass vs. Zgg, effect of SPC

- Update in Mar. 6:

FastJet on RCF

Below are instructions for installing and running FastJet on RCF.

IS 2019 abstract on D0 v1

 

EPD Rack Temperature Before and After_3MAR19

 

Weekly Meeting (Mar 4, 2019)

 ZZW; uncertainty agian

deuteron and triton production at 27GeV(Run 18)

 

The third EPD timing scan of 2019

The first EPD timing scan took a good part of the weekend of 23-24 Feb 2019, due to poor beam availability.  But unfortunately the QT32B algorithm had a corrupting bug.

Bad Run list at 27GeV(Run 18)

 

EPD Performance March 2, 2019

All runs had:
QTC TAC_Max 2900
QTC_TAC_Min 300
TACdiff_max 4720
TACdiff_min 3470
EWdiff_max 163
EWdiff_min 93