Sort by:[Date]

bTOFVPD-Reference-Plots for Run19

 

a toy model timing scan for gated integrator of an exponential pulse of random hit time

To help (or not) to clarify discussions we're having about how to best interpret timing curves, for instance in EPD, I made a very trivial toy model in Mathematica.

abstract and talk for chirality workshop

Abstract for initial stages 2019

Non-uniform detector acceptance problem in v2 analysis

 The goal is to measure the elliptic flow $v_2$ in d+Au collisions using the multiparticle correlation method.

deuteron and triton production at 27GeV(Run 18)

 

The second timing scan of 2019


The first EPD timing scan took a good part of the weekend of 23-24 Feb 2019, due to poor beam availability.  But unfortunately the QT32B algorithm had a corrupting bug.

HF minutes 2019/2/28

1) Ds analysis update - Chuan Fu

QT32B ADC Gain Comparison Using Different L0 MCS Files 28FEB19

 

GridLeak Wall voltage test

On 2019-02-27, I spent some time at the experiment running some tests to record (via slow controls into the online database) GridLeak wall currents under various conditions, given the confusion I had

Feb 28 QA