Sort by:[Date]

DIS 2016 - proceedings

Track-by-track analysis of Victor's proposed tracking code changes

 Track-by-track analysis of Victor's proposed changes

Abstract for Baldin Seminar on High Energy Physics Problems

Wilga proceedings v3

Wilga proceedings v3

DNP2016 Abstract

 LaTeX pasted below, pdf attached.

v3.0

Pion0 An result 2016-6-23

 

Abstract for SPIN 2016

 

BBC timing calibration (with slewing correction), run 15

Track vertex vs. BBC time difference (BBC triggers only):
- (gray) elliptical Gaussian fit
- (open circles) Gaussian fits to slices in BBC time difference

J/Ψ Efficiency of Pid Cuts for 160623 HF PWG Weekly Meeting

FCal spin 160623