Alignment
Updated on Mon, 2013-05-20 13:01. Originally created by malong on 2013-05-20 13:01.first low lumi run for UPCpp
Updated on Mon, 2013-05-20 10:33. Originally created by ramdebbe on 2013-05-20 10:33.Reference
Talk time : 11:30, Duration : 00:20
Run12 200GeV Beam Crossing Analysis
The 200GeV beam crossing analysis has been completed. This year I finally wrote up a "how-to" PDF that outlines how to move this process forward for those who haven't done it before.
Brief description of the L2W Barrel trigger monitoring plots (thanks to Justin Stevens)
First noise run with Mimosa26 DAQ system in BNL
Updated on Sun, 2013-05-19 15:26. Originally created by diruzzab on 2013-05-19 15:26. Under:First PXL low lumi run
The first set of runs were taken on Friday evening. (5/16/2013)
I collected the notes I send out to the mailing list, and added two online plots for illustration.
PXL run 13 real data.
run 14103754, 3 events passed through the offline reco. chain
BFC chain (pp fast offline) :
Run QA of Run12 200GeV p-p Data
The event QA of the run 12 200 GeV data set is complete. See the attachments to get the full story of the bad runs, along with the plots.
A_NN and A_SS analysis note
ITEP group presents the note on the double spin asymmetries analysis from 2009 dedicated pp2pp run data. The note includes final analysis results as well as systematic errors estimation.
Pixel Offline Status/Mask Tables
This page introduces the proposed offline status/mask tables for PXL subsystem. There are three tables introduced here.
estar phone meeting
Updated on Tue, 2013-06-04 10:52. Originally created by xzb on 2013-05-17 11:07.EVO/SeeVogh #12 3569 (noon-1PM EDT) , at 16:00 (GMT), duration : 00:00
1) update on FCS hyperon simulation (LEN)
http://drupal.star.bnl.gov/STAR/blog/leun/2013/may/21/lambda-hyperon-proton-pi-channel2) forward tracking (Alex/Zhenyu)
3) continue from last meeting item 1,2,4,5)
http://drupal.star.bnl.gov/STAR/event/2013/05/21/estar-phone-meeting
Best regards, Ernst and Zhangbu
estar phone meeting
Updated on Tue, 2013-06-04 10:20. Originally created by xzb on 2013-05-17 11:07.EVO/SeeVogh #12 3569 (noon-1PM EDT) , at 16:00 (GMT), duration : 00:00
1) eSTAR LoI to DOE
Charges from ALD
our plan for the summer:
a) writting committee (Nu Xu)
b) assignment to writing members
c) tasks, main simulation and physics goals
d) meetings, phone meetings and monthly face2face meetings
2) EIC R&D calls and reports
a) GTRD
http://drupal.star.bnl.gov/STAR/system/files/GTRD_EIC_RDproposal_FY2013_v1.pdf
b) FCS
http://drupal.star.bnl.gov/STAR/system/files/EIC_CAL-Consortium-ProgressReport-May2013.pdf
3) FCS update
Lambda->n+pi0
http://drupal.star.bnl.gov/STAR/blog/leun/2013/may/07/fcs-simulation-hyperon-update
Lambda->p+pi-
http://drupal.star.bnl.gov/STAR/blog/leun/2013/may/21/lambda-hyperon-proton-pi-channel
4) iTPC update
http://drupal.star.bnl.gov/STAR/system/files/Lambda_Efficiency_itpc_Simulation_May20.pdf
5) eSTAR simulations
http://drupal.star.bnl.gov/STAR/system/files/eSTAR_20130503.pptx
Thanks!
Ernst and Zhangbu
Alignment tests update
Updated on Fri, 2013-05-17 11:05. Originally created by margetis on 2013-05-17 10:58.geometry parameters + next steps for offline reconstruction
Updated on Fri, 2013-05-17 10:48. Originally created by bouchet on 2013-05-17 10:48.Reference
Speaker : Flemming/ Hao / Jonathan
Talk time : 12:30, Duration : 00:20
L2 Monitoring Run 2013 : L2EtowW_QA
L2EtowW Automatic QA based on L2automatic macro created by Maxence Vandenbroucke.
Run list production primer for RUN 12 pp500
This page details the steps followed to produce the 1st priority, 2nd priority, and discard run lists.