Useful Documents
Updated on Mon, 2008-08-18 22:11. Originally created by balewski on 2006-05-30 02:56. Under: A full list of attached documents is available below, but I wanted to highlight a few here:
BEMC Technical Design Report (PDF)
"Real Multiplicity" mixing for pion-kaon
Updated on Fri, 2006-05-26 04:57. Originally created by kisiel on 2006-05-26 04:57.Reference
Speaker : Adam Kisiel ( Warsaw University of Technology )
Talk time : 15:40, Duration : 00:10
Shutdown schedule
Updated on Thu, 2006-06-15 09:52. Originally created by rlbrown on 2006-05-25 09:34. Under:FY06
Updated on Wed, 2006-06-28 08:56. Originally created by rlbrown on 2006-05-25 09:34. Under:STAR FY06 Shutdown Schedule
Project Start Date: 6/26/06
Project Finish Date: 10/27/06
STAR Technical Support Group
Updated on Sun, 2008-07-06 15:02 by testadmin. Originally created by rlbrown on 2006-05-25 09:27. Under:On this site you'll be able to:
- See the latest shutdown schedule for the STAR Detector
- Search STAR Mechanical Drawings Database and view the actual
Proton femtoscopy- paper proposal
Updated on Thu, 2006-05-25 08:02. Originally created by hbtuser on 2006-05-25 08:02.Reference
Speaker : Hania Gos, Adam Kisiel ( Warsaw University Of Technology, SUBATECH )
Talk time : 15:30, Duration : 00:10
AOB
Updated on Wed, 2006-05-24 10:26. Originally created by testadmin on 2006-05-24 10:26.Speaker : All
Talk time : 12:50, Duration : 00:10
p+p Spin PWG analysis QA overview
Updated on Wed, 2006-05-24 10:33. Originally created by testadmin on 2006-05-24 10:25.Speaker : Jim Sowinsky ( IUCF )
Talk time : 12:40, Duration : 00:10
E-EMC status and timeline for readiness for Y6 p+p
Updated on Wed, 2006-05-24 11:14. Originally created by balewski on 2006-05-24 10:25.Speaker : Jan Balewski ( IUCF )
Talk time : 12:30, Duration : 00:10
B-EMC calibration readiness for p+p
Updated on Wed, 2006-05-24 11:24. Originally created by kocolosk on 2006-05-24 10:24.Speaker : Adam Kocoloski ( MIT )
Talk time : 12:20, Duration : 00:10
1) SMD/PSD pedestals - we have a student analyzing these. Shouldn't be a problem to have the tables ready for zero-suppressing during production.
2) Tower status tables - goal is to get preliminary, "broad brush" status tables ready. We're in a transition period here and we haven't yet named a new person to do the final status tables for 2006. I contacted one of our newer students the other day; hopefully we can get this task assigned soon.
Calibration status overview for TPC, p+p
Updated on Wed, 2006-05-24 10:51. Originally created by testadmin on 2006-05-24 10:23.Speaker : Gene Van Buren ( BNL )
Talk time : 12:10, Duration : 00:10
BeamLine Constraint
- Chain has been developed and tested
- Useful triggers have been identified
- File list to process has been created
- Will process through Tuesday, 16th of May initially to confirm it is going well
- Will then process through today
- Still some possibility for automating this through the end of the run
- Processing in progress; should be finished with part 1 within a day or so
SpaceCharge & GridLeak
- Calibrations using the ppProductionLong dataset from the past couple weeks is underway
- Increased luminosity has made distortion larger than ever: now seeing primary vertex DCA distortions of close to 2cm!
- I have been calibrating without a BeamLine constraint, which should hypothetically only smear my DCAs, not bias them...but I want to be sure...
- Want to verify calibration of SpaceCharge & GridLeak with calibrated BeamLine before DB insertion; time estimate is end-of-this-week
- Will need to re-calibrate with different beam polarizations/energies
Short in TPC IFC East
- As Field Cage Shorts, there is a distortion due to an electrical short in the TPC IFC East
- The excess current has been slowly increasing over the past couple months, so Blair & I decided to increase the compensating resistance today to again reduce the distortion
- R&D still to be done on how to handle the non-constant excess current for a better calibration
Gene Van Buren
gene@bnl.gov
Status of the SVT review production
Updated on Wed, 2006-05-24 10:23. Originally created by testadmin on 2006-05-24 10:20.Speaker : Lidia Didenko ( BNL )
Talk time : 12:00, Duration : 00:10
Miscellaneous TPC calibration notes
Updated on Sun, 2006-05-21 00:14. Originally created by hjort on 2006-05-20 13:22. Under: The log file for automated drift velocity calculations is at ~starreco/AutoCalib.log.
Log files for fast offline production are at /star/rcf/prodlog/dev/log/daq.
The CVS area for TPC calibration related scripts, macros, etc., is StRoot/macros/calib.
Log files for fast offline production are at /star/rcf/prodlog/dev/log/daq.
The CVS area for TPC calibration related scripts, macros, etc., is StRoot/macros/calib.
ExB (twist) calibration procedure
In 2012, the procedure documentation was updated, including global T0 calibration:
Web Access
Updated on Fri, 2020-01-17 17:56 by testadmin. Originally created by jeromel on 2006-05-18 12:21. Under:AOB
Updated on Wed, 2006-05-17 10:46. Originally created by testadmin on 2006-05-17 10:43.Speaker : All
Talk time : 13:00, Duration : 00:10
- Vulnerability Remediation - Highs and Moderates should all be gone
Spin PWG simulation status
Updated on Wed, 2006-05-17 10:41. Originally created by potekhin on 2006-05-17 10:22.SVT/SSD review production library status (P06ic)
Updated on Wed, 2006-05-17 10:22. Originally created by testadmin on 2006-05-17 10:21.Speaker : Lidia Didenko ( BNL )
Talk time : 12:40, Duration : 00:10
SVT review data samples, overview
Updated on Wed, 2006-05-17 10:38. Originally created by jeromel on 2006-05-17 10:18.Speaker : Moi ( BNL )
Talk time : 12:30, Duration : 00:10
We will revisit the agenda You do not have access to view this node and especially You do not have access to view this node
Track parameters extension & vertex errors - proposal
Updated on Wed, 2006-05-17 10:18. Originally created by testadmin on 2006-05-17 10:17.Speaker : Yuri Fisyak ( BNL )
Talk time : 12:20, Duration : 00:10